Download presentation
Presentation is loading. Please wait.
Published byEllen Shelton Modified over 5 years ago
1
Coast to Coast Trail: FDOT District Seven Update
Florida Department of TRANSPORTATION Coast to Coast Trail: FDOT District Seven Update September 25, 2018 Alex Henry Bicycle and Pedestrian Coordinator Florida Department of Transportation- District Seven
2
Today’s Presentation Pinellas Trail Connector Starkey Gap Connector
Good Neighbor Trail Connectors Ph I & Ph II Good Neighbor/ Withlacoochee Connector Florida Department of Transportation
3
Pinellas Trail Connector
Opened July 20, 2017 Florida Department of Transportation
4
Pinellas Trail Connector
5 mile extension Connects to 50+ miles of Pinellas Trail Florida Department of Transportation
5
Starkey Gap Connector 2.4 Miles: Pinellas Trail to Starkey Trail
Connect 80+ miles of continuous trail Construction began: July 2018 Anticipated Completion: Summer 2019 Florida Department of Transportation
6
Good Neighbor Trail Connector- Ph I
4 miles: Suncoast Trail to Good Neighbor Trail Connector Ph II Currently in Design (Phase II Plans) Construction anticipated to begin in 2020 Florida Department of Transportation
7
Good Neighbor Trail Connector- Ph II
Connection from Ph I to Existing Good Neighbor Trail PD&E and Preliminary Design Underway Public Hearing February 2019 Construction funded in 2022 Florida Department of Transportation
8
Good Neighbor/Withlacoochee Connector
6.6 miles Connecting Existing Good Neighbor Trail to Withlacoochee State Trail Completed September 2018 Florida Department of Transportation
9
Florida Department of Transportation
Questions? Alex Henry Bicycle and Pedestrian Coordinator Florida Department of Transportation- District Seven Florida Department of Transportation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.