Presentation is loading. Please wait.

Presentation is loading. Please wait.

Coast to Coast Trail: FDOT District Seven Update

Similar presentations


Presentation on theme: "Coast to Coast Trail: FDOT District Seven Update"— Presentation transcript:

1 Coast to Coast Trail: FDOT District Seven Update
Florida Department of TRANSPORTATION Coast to Coast Trail: FDOT District Seven Update September 25, 2018 Alex Henry Bicycle and Pedestrian Coordinator Florida Department of Transportation- District Seven

2 Today’s Presentation Pinellas Trail Connector Starkey Gap Connector
Good Neighbor Trail Connectors Ph I & Ph II Good Neighbor/ Withlacoochee Connector Florida Department of Transportation

3 Pinellas Trail Connector
Opened July 20, 2017 Florida Department of Transportation

4 Pinellas Trail Connector
5 mile extension Connects to 50+ miles of Pinellas Trail Florida Department of Transportation

5 Starkey Gap Connector 2.4 Miles: Pinellas Trail to Starkey Trail
Connect 80+ miles of continuous trail Construction began: July 2018 Anticipated Completion: Summer 2019 Florida Department of Transportation

6 Good Neighbor Trail Connector- Ph I
4 miles: Suncoast Trail to Good Neighbor Trail Connector Ph II Currently in Design (Phase II Plans) Construction anticipated to begin in 2020 Florida Department of Transportation

7 Good Neighbor Trail Connector- Ph II
Connection from Ph I to Existing Good Neighbor Trail PD&E and Preliminary Design Underway Public Hearing February 2019 Construction funded in 2022 Florida Department of Transportation

8 Good Neighbor/Withlacoochee Connector
6.6 miles Connecting Existing Good Neighbor Trail to Withlacoochee State Trail Completed September 2018 Florida Department of Transportation

9 Florida Department of Transportation
Questions? Alex Henry Bicycle and Pedestrian Coordinator Florida Department of Transportation- District Seven Florida Department of Transportation


Download ppt "Coast to Coast Trail: FDOT District Seven Update"

Similar presentations


Ads by Google