Windward Community College ARLISS/USLI Presentation Fall 2009 KCC, Ohi’a Room 118 November 21, 2009 Premo Ames II Todd Esposito Joleen Iwaniec Patrick.

Similar presentations


Presentation on theme: "Windward Community College ARLISS/USLI Presentation Fall 2009 KCC, Ohi’a Room 118 November 21, 2009 Premo Ames II Todd Esposito Joleen Iwaniec Patrick."— Presentation transcript:

1 Windward Community College ARLISS/USLI Presentation Fall 2009 KCC, Ohi’a Room 118 November 21, Premo Ames II Todd Esposito Joleen Iwaniec Patrick Lancaster Jasmine Maru

2

3 ARLISS 2009

4 Thank You!

5 University Student Launch Initiative
Team Members Todd Esposito Patrick Lancaster Joleen Iwaniec Premo Ames II Jazmine Maru

6 Utah Conference 2009 Advanced Rocketry Workshop Bonneville Salt Flats

7 Level 1 Certification flight
Bonneville Salt Flats, Utah Todd Esposito

8 Level 1 Certification Attempt
Black Rock, Nevada After Before

9 Certification Launches
Black Rock, Nevada Level 1 Level 2

10 Level 2 Certification Complete

11 Educational Outreach USLI is education outreach oriented
Minimum 2 outreach events

12 Community Support

13 This Is A Competition! Preliminary Design Review 100
Critical Design Review Flight Readiness Review Education Engagement Website Successful flight and Recovery Altitude Final Report Total: 1000

14 Characteristics, Construction, & Recovery

15 Initial design criteria
5,280 ft Carry a student payload National CanSat program No bigger than a 12 fl oz soda can Mass no greater than 1 kg USLI requires a dual deployment recovery

16 Characteristics Electronics in nose cone Air brake system
Three fin design

17 Construction G10 fiberglass Motor K560W by Aerotech
2,560 Newton seconds (thrust)x(burn time) 120 lbs of thrust 4.5 seconds of burn time

18 Flight Profile 5 phases Boost phase Coast phase
Deployment of drogue chute at apogee Initial decent rate Approximately 60 ft/sec Deployment of main chute at 500 ft Slows approximately to less than 20 ft/sec Close and intact recovery

19 WEB PRESENCE The team shall have a web presence maintained/updated throughout the period of performance that will be judged at random times throughout the year. No set guidelines for web presence in USLI rules book NASA MSFC will receive the required documents through website

20 Far Exceeds Expectations
SCORING Website (5%) Website updated PDR Far Exceeds Expectations 5 Website updated CDR Website updated FRR Total (15) 15 Points (50): % of Website total 100 50

21 WCC CAE WEBSITE Currently hosted on Laulima
Limited capability using Laulima editing tool. New website under construction

22 Gantt Plot

23 Any Questions?