Download presentation
Presentation is loading. Please wait.
Published byTyrone Vernon Newman Modified over 5 years ago
1
Windward Community College ARLISS/USLI Presentation Fall 2009 KCC, Ohi’a Room 118 November 21, Premo Ames II Todd Esposito Joleen Iwaniec Patrick Lancaster Jasmine Maru
3
ARLISS 2009
4
Thank You!
5
University Student Launch Initiative
Team Members Todd Esposito Patrick Lancaster Joleen Iwaniec Premo Ames II Jazmine Maru
6
Utah Conference 2009 Advanced Rocketry Workshop Bonneville Salt Flats
7
Level 1 Certification flight
Bonneville Salt Flats, Utah Todd Esposito
8
Level 1 Certification Attempt
Black Rock, Nevada After Before
9
Certification Launches
Black Rock, Nevada Level 1 Level 2
10
Level 2 Certification Complete
11
Educational Outreach USLI is education outreach oriented
Minimum 2 outreach events
12
Community Support
13
This Is A Competition! Preliminary Design Review 100
Critical Design Review Flight Readiness Review Education Engagement Website Successful flight and Recovery Altitude Final Report Total: 1000
14
Characteristics, Construction, & Recovery
15
Initial design criteria
5,280 ft Carry a student payload National CanSat program No bigger than a 12 fl oz soda can Mass no greater than 1 kg USLI requires a dual deployment recovery
16
Characteristics Electronics in nose cone Air brake system
Three fin design
17
Construction G10 fiberglass Motor K560W by Aerotech
2,560 Newton seconds (thrust)x(burn time) 120 lbs of thrust 4.5 seconds of burn time
18
Flight Profile 5 phases Boost phase Coast phase
Deployment of drogue chute at apogee Initial decent rate Approximately 60 ft/sec Deployment of main chute at 500 ft Slows approximately to less than 20 ft/sec Close and intact recovery
19
WEB PRESENCE The team shall have a web presence maintained/updated throughout the period of performance that will be judged at random times throughout the year. No set guidelines for web presence in USLI rules book NASA MSFC will receive the required documents through website
20
Far Exceeds Expectations
SCORING Website (5%) Website updated PDR Far Exceeds Expectations 5 Website updated CDR Website updated FRR Total (15) 15 Points (50): % of Website total 100 50
21
WCC CAE WEBSITE Currently hosted on Laulima
Limited capability using Laulima editing tool. New website under construction
22
Gantt Plot
23
Any Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.