Download presentation
Presentation is loading. Please wait.
Published byusman usman Modified over 5 years ago
1
PRAKTIKUM MANAJEMEN OPERASI APLIKASI POM-QM FOR WINDOWS Lektion Null(#0): Pendahuluan Verfasser bei Usmania Institute
2
Dosen Usman, S.Si, MT HP/WA: 081.5665.8285 Email: usman_dachlan@yahoo.comusman_dachlan@yahoo.com
3
Referensi Weiss, Howard J. (2006), Manual POM - QM FOR WINDOWS, Version 3 ‒ Software for Decision Sciences: Quantitative Methods, Production and Operations Management, Pearson Education, Inc., Upper Saddle River, New Jersey. Heizer, Jay, and Render, Barry., Operations Management: Sustainability & Supply Chain Management, 11th ed. (2014), Pearson Education, Inc., New Jersey Terjemahan: Manajemen Operasi: Keberlanjutan dan Rantai Pasokan, edisi 11 (2015), Salemba Empat, Jakarta. Taha, Hamdy A. (2007), Operations Research – An Introduction, Pearson Education, Inc., New Jersey
4
Penilaian Kompisis Nilai: – Tugas: 30% – UTS: 30% – UAS: 40% Nilai harian akan digunakan untuk mendongkrak nilai UTS dan UAS yang buruk. Meskipun UTS dan UTS sama sekali tidak bisa, mahasiswa tetap akan mendapat nilai “C”, jika: – Tidak hadir paling banyak 1 kali (dengan alasan apapun) – Mengumpulkan tugas Hanya mahasiswa yang tidak hadir lebih dari 1 kali dan/atau tidak mengumpulkan tugas yang berpeluang mendapat nilai “D” bahkan “E”.
5
Tugas Besar Tugas Besar akan diberikan setelah UTS Deskripsi Tugas: Lakukan kunjungan industri dan buat laporan analisis keputusan atas masalah yang sedang dihadapi oleh industri tersebut. Penjelasan lebih lanjut tentang Tugas Besar akan diberikan setelah UTS
6
Remidi Remidi hanya diperbolehkan jika: – Nilai akhir ≥ 65 (bagi yang mengharap nilai “B”) – Nilai akhir ≥ 55 (bagi yang mengharap nilai “C”) – Nilai UAS < 70
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.