Presentation is loading. Please wait.

Presentation is loading. Please wait.

SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from.

Similar presentations


Presentation on theme: "SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from."— Presentation transcript:

1 SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from lubricator for HPHT wells. Witness gauge calibration if possible Sampling – Oil down hole if FBHP > Pb Gas – all surface samples 3 surface samples after main flow period Two types of dh sampler Single phase sampler – nitrogen compensated – laser DST string sampler – no compensation for pressure drop- dst company Positive displacement sample – recommended – laser Underbalance fluid should be selected to prevent hydrate formation May also kick-off well by injecting methanol Salinity checks during clean-up to confirm when well is clean

2 SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from lubricator for HPHT wells. Witness gauge calibration if possible Sampling – Oil down hole if FBHP > Pb Gas – all surface samples

3

4

5

6

7

8

9

10 Clean-up = 80.3hours Main test = 54 hours

11

12

13

14


Download ppt "SRO can be run on e-line only during builp-up Rum SRO with EMR as back-up SRO Issues – cost, time to run e-line, specialist personnel, leak tendency from."

Similar presentations


Ads by Google