Base Case Build Process

Similar presentations


Presentation on theme: "Base Case Build Process"— Presentation transcript:

1 Base Case Build Process
Elena Melloni Associate Engineer Western Electricity Coordinating Council

2 Western Electricity Coordinating Council
Discussion Outline WECC Base Case Building Procedure Powerflow construction Dynamics Conversions Posted Zip files Reporting Data Anomalies Western Electricity Coordinating Council

3 Base Case Compilation Schedule
DATE DATA REQUEST MAILED DATE DATA DUE TO DATA SUBMITTER DATE DATA DUE TO WECC STAFF WECC STAFF SEND CASE FOR REVIEW DATE COMMENTS DUE TO DATA SUBMITTER DATE DATA SUBMITTER COMMENTS DUE TO WECC STAFF WECC STAFF FINALIZE DATE 2021 LSP1-S 07/21/17 08/18/17 09/15/17 09/29/2017 10/13/2017 10/20/2017 11/03/2017 HW1 08/04/17 09/01/17 09/29/17 10/27/17 11/10/17 11/17/17 12/01/17 2028 HS1 2028 LSP1-S3 09/08/17 10/6/17 11/3/17 N/A HW1-S 10/06/17 11/03/17 12/15/17 12/29/17 01/05/18 01/19/18 HW3-OP 11/17/17 12/15/17 01/12/18 02/9/18 02/23/18 03/09/18 03/23/18 LW1-OP 2019 HSP1-OP 01/5/18 02/2/18 03/2/18 03/30/17 04/13/18 04/20/18 05/04/18 HW2 02/16/18 03/16/18 05/11/18 05/18/18 06/01/18 06/15/18 2024 HS2 2019 HS3-OP 04/06/18 06/29/18 07/13/18 07/27/18 08/10/18 2019 LS1-OP 2019 LSP1-S 05/25/18 06/22/18 07/20/18 08/17/18 08/24/18 08/31/18 09/14/18 HW1 07/06/18 08/03/18 09/28/2018 10/05/2018 10/19/2018 11/2/2018 2029 HS1 2029 HSP1-S 10/05/18 11/02/18 11/30/18 12/28/18 1/04/19 1/11/19 02/25/19 Western Electricity Coordinating Council

4 Base Case Building Power Flow
Data Submitter uploads “prerun” files: Area Specific power flow data L&R spreadsheet Any Dynamics model changes/updates Any tie line changes (must be coordinated!!!!) List of significant changes Any additional info that will help with base case compilation Western Electricity Coordinating Council

5 Area Interchange Schedules
BC Hydro Interchange with Northwest 2300 MW Northwest Interchange with BC Hydro -2300 MW Area interchange case specific spreadsheet: located on the team site Western Electricity Coordinating Council

6 Western Electricity Coordinating Council
Extracting Area Data Western Electricity Coordinating Council

7 The Master Tie Line File
Contains data for the following: Branches Transformers Line connected shunts Transformer impedance tables Interface data (Paths) Branch interface data Zones Owners BAAs Area Interchanges Western Electricity Coordinating Council

8 Western Electricity Coordinating Council
Tying It All Together Western Electricity Coordinating Council

9 Power Flow Solution and Data Checking
Tie line check Island check Edit table checks Checkazo.p Mustfix.p Checks.p svdsnap.p Pathmoni.p Dchk Overload check Branches (Chkrating.p & SADD) Paths (Pathmoni.p) DCINTMT.p Insert Gen ID (WSM map) Need data for others Fix owner epcls Fix bad gen owner.p Fix owner–noparticipation.p Qtab correction.p Western Electricity Coordinating Council

10 PF Data Checking continued
PSS®E Users Data InsertLID.p Baseloader.p InsertTurbine.p FillRatingsPSSe.p Contingencies (Operations Cases) Replog & Steady state and Dynamics Dashboard (SADD) PowerWorld Western Electricity Coordinating Council

11 Base Case Building - Dynamics
The Master Dynamics File (MDF) Models Updates in PSLF format Temporary vs. permanent changes Condenser and pump check Composite load models Western Electricity Coordinating Council

12 Initializing Dynamics Data
Reading in the MDF Missing data (updated ID or netted) Duplicate models Initialization Governor errors (check real power limits) Exciter errors (bad voltage profiles) Other messages Western Electricity Coordinating Council

13 Western Electricity Coordinating Council
Running and Plotting A no-disturbance run The DYTOOLS disturbance routine Ringdown (Chief Jo Break) Double Palo Verde Outage (when PDCI flow is N-S) Loss of PDCI (when PDCI flow is S-N) Post-transient solution Standard Disturbances Midway-Diablo and Midway-Gates Comanche-Daniels Park Colorado River – Red Bluff Hells Canyon – Brownlee Double Palo Verde Outage or loss of PDCI DYTOOLS? Western Electricity Coordinating Council

14 Western Electricity Coordinating Council
Plotting Plotting the channel file Searching for the largest deviation (spread) Plotting Parameter Efd – 0.063 PG – 1.0 Spd – 0.000 Other paramters – qg, qsvc, qstc Western Electricity Coordinating Council

15 Western Electricity Coordinating Council
Plotting Western Electricity Coordinating Council

16 Power Flow Conversions
PSS®E Conversion Case Prep (combine SVDs, Net DG, negative transformer types, shift ratings) WECCLF Dummy bus Case IDV Difference Compare PowerWorld EPC Difference Compare Dynamics Western Electricity Coordinating Council

17 Base Case Building - Comments
Types Submitted in EPCL, EPC, .m, or by list Epcl_xtractv21d.p MUST be made to review case Changes to tie lines must be coordinated Extensive data changes Western Electricity Coordinating Council

18 Files included in ZIP folders
Base Case (.sav, .epc, .raw, .pwb) Dynamics(.dyd, e.dyd) ASMAT Annual Study Program Results Log Data Checking (Replog, CaseCheck Dynamics, CaseCheck Powerflow, SADD) Pss_exempt.dat Supplemental.zip Signoff Bubble (.jpg, Bubble_33.drw, Bubble_33.irf) PTI data Templates (Ba data, baseload, composite load long IDs, turbine type) *_pf.idv Loads_*.csv Western Electricity Coordinating Council

19 Reporting Data Anomalies
Master Tie Line File Data Multi-section lines Series Compensation New Phase Shifters PSS Exemptions Dynamics Data Western Electricity Coordinating Council

20 Western Electricity Coordinating Council
Questions? Elena Melloni: Nick Hatton: Matt Torgesen: Western Electricity Coordinating Council