Presentation is loading. Please wait.

Presentation is loading. Please wait.

The PHELIX Control System PCS

Similar presentations


Presentation on theme: "The PHELIX Control System PCS"— Presentation transcript:

1 The PHELIX Control System PCS
Stefan Götte PHELIX GSI Helmholtzzentrum für Schwerionenforschung GmbH CS-Workshop February 28th, 2013

2 PHELIX in 2012 Beamtime: Shot statistics: only 10% downtime
68% of the time related to experiments (total 18: Z6, PLH, xRay-Lab) rest: internal Shot statistics: 3556 shots in total 80 failures (2,2%) 2365 experiment shots 27 failures (1,1%)

3 The PCS: Facts and Numbers
OS: Windows XP LabVIEW 2009 CS-V3.21 running on 23 nodes (20 PCS, 1 developer, and 2 hardware test nodes) 25 executables (four types) 70 PHELIX classes about 350 instances about process variables the PCS is (still) one of the largest CS applications

4 PCS: Working Horses Sequencer Beamline PILS
48 controls, 114 indicators 12 states (SM) 43 methods 401 user VIs Beamline 177 controls, 163 indicators 40 methods 309 user VIs PILS 16 controls, 203 indicators 16 methods 262 user VIs

5 Sunrise at the control room …

6 Switch it on … (Remote) reboot* Autologin* Copy executables*
DSC-Engine* (Remote) start of PCS* Laserfreigabe *: if necessary

7 … align it … select the subsystem check the beam position
align the beam check parameters easy enough for scientists …

8 … make a shot … Search PLH PreAmp- and MainAmp-Freigabe Set parameters
Checklist Shot Afterwards in case of a failure:

9 … and check the results.

10 Sunshine after the Shot …

11 Latest News: Getting rid of the DSC-Engine
Status: PHELIX uses old DSC engine (LV 7.1) for Beckhoff Problem: SIEMENS OPC Server is not running with modern DSC-Engine Solution: direct connection to Beckhoff (ADS DLL) Hardware: BK9050 (twisted pair) Software: New class

12 Outlook new classes … migration to new(er) LabVIEW version …
next operating system … Helmholtz beamline …


Download ppt "The PHELIX Control System PCS"

Similar presentations


Ads by Google