Download presentation
Presentation is loading. Please wait.
Published byAndreas Heinrich Modified over 6 years ago
1
CS 321 Design Project Phase Five: Usability Tests
Using your Phase Four high-fidelity prototype, your team will… Develop at least four Study Tasks for the application Must have measurable performance metrics (completion time, number of keystrokes, etc.) Enter Study Task info on Morae, assuming Auto-Pilot will be used during usability tests Develop Study Survey questions, one to be asked after each Study Task One of each type: Scale, Select One Answer, Select One Or More, Freeform Develop at least three Study Tasks to compare a task performed with your HFP and a task performed some existing application software already loaded on the HCI iMac Must have measurable performance metrics (completion time, number of keystrokes, etc.) Enter Study Task info on Morae, assuming Auto-Pilot will be used during usability tests Add the System Usability Scale set of questions at the end of your survey Have someone on your team take the usability test in order to sure that the btasks and survey questions are presented correctly using Morae’s Auto-Pilot Conduct usability tests with your assigned test subjects – no more than one hour per calendar day, but multiple tests in one hour are fine
2
CS 321 Design Project Phase Five: Deliverables
The deliverables for Phase Five are… One 1000-word Microsoft Word document containing: Report of statistical results of usability tests Explanation and critique of your team’s development process In-depth analysis of how development process could have been modified to improve results Appendix reporting raw data from the usability test tasks and surveys (not included in 1000 words)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.