Download presentation
Presentation is loading. Please wait.
1
Saclay Test Facilities
2 December 2010 O. Napoly, EuCARD RF-Tech Worshop, PSI
2
Industrialisation of XFEL Cryomodule Assembly
Cryomagnetism 30 November2010 Industrialisation of XFEL Cryomodule Assembly
3
Industrialisation of XFEL Cryomodule Assembly
Cryomagnetism 30 November2010 Industrialisation of XFEL Cryomodule Assembly
4
Industrialisation of XFEL Cryomodule Assembly
Superconducting RF 30 November2010 Industrialisation of XFEL Cryomodule Assembly
5
Industrialisation of XFEL Cryomodule Assembly
Superconducting RF 30 November2010 Industrialisation of XFEL Cryomodule Assembly
6
Industrialisation of XFEL Cryomodule Assembly
Clean Room Layout ISO 7 (class ) 28 m2 5.92 m x 4.72 m ISO 5 (class 100) 38 m2 7.72 m x 4.72 m ISO4 (Class 10) 112 m² 7.8 m x ( ) m 15.6 m 30 November2010 Industrialisation of XFEL Cryomodule Assembly
7
Industrialisation of XFEL Cryomodule Assembly
Cryogenics 30 November2010 Industrialisation of XFEL Cryomodule Assembly
8
Industrialisation of XFEL Cryomodule Assembly
High RF Power Two 352 MHz klystrons of 1 MW CW (LEP) on loan from CERN One 1.3 GHz klystron, 1.5 MW, 1ms 10Hz pulsed (Thales) One 704 MHz klystron, 1MW pulsed (CPI) One 704 MHz IOT, 80 kW CW 30 November2010 Industrialisation of XFEL Cryomodule Assembly
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.