Download presentation
Presentation is loading. Please wait.
1
IEEE 802.21 MEDIA INDEPENDENT HANDOVER
DCN: Title: Liaison Report – Work Related to Date Submitted: July 15, 2010 Source: Dan Gal, Alcatel-Lucent Abstract: liaison report on Session #68 in San Diego San Diego, California July 15, Dan Gal, ALU Slide 1 January 19, David Hunter, Panasonic
2
IEEE 802.21 presentation release statement
This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual < and in Understanding Patent Issues During IEEE Standards Development San Diego, California July 15, Dan Gal, ALU Slide 2 January 19, David Hunter, Panasonic
3
Liaison Report IEEE 802.16 Session #68, San Diego
Dan Gal Alcatel-Lucent San Diego, California July 15, Dan Gal, ALU Slide 3 January 19, David Hunter, Panasonic
4
Objectives of this session:
Summary Objectives of this session: TGm: Resolve the first round of Sponsor ballot comments on p802.16m/draft D6. TGmaint: Resolve a few maintenance comments the resolution of which would go into 16m/D7 TGh: Project is complete. No meeting planned for this session. Project Planning (PP): Finalize the PAR and 5C (five criteria) for the M2M proposed project. TGn, a.k.a – GRIDMAN: Continue drafting and possibly finish the SRD – System requirements document. San Diego, California July 15, Dan Gal, ALU Slide 4 January 19, David Hunter, Panasonic
5
802.16m/D6 Sponsor ballot comments resolution
The 16m/D6 sponsor ballot that closed on July 9, has failed with an approval rate of 58%. There are 817 technical and 187 editorial comments to resolve this week. 233 contributions accompany comments. A recirculation – D7 – of the 16m draft, would certainly be needed and recirculation #1 of the Sponsor Ballot is likely to start in two to three weeks time. The target completion date of the 16m amendment remains Dec-2010 San Diego, California July 15, Dan Gal, ALU Slide 5 January 19, David Hunter, Panasonic
6
802.16p - M2M Study Group Study Group Committee on Machine to Machine (M2M) started its work three sessions ago. It plans to submit a PAR+5C request to the EC on Friday July 16, 2010. Status: Currently developing a pre-draft for the SRD (System Requirements Document). Will likely start to operate as TGp in August 2010. San Diego, California July 15, Dan Gal, ALU Slide 6 January 19, David Hunter, Panasonic
7
802.16n – GRIDMAN Study Group This is the study group on Greater Reliability In Disrupted Metropolitan Area Networks was created at session #58 and its PAR approved in March 2010. It still operates as a study group, pending decision of the chair, rather than a task group. Status this week: advanced the development of the Requirements Document (SRD) to near completion. Problem area: running into overlap and conflicts with M2M functionalities. San Diego, California July 15, Dan Gal, ALU Slide 7 January 19, David Hunter, Panasonic
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.