Presentation is loading. Please wait.

Presentation is loading. Please wait.

Capital Outlay Workshop

Similar presentations


Presentation on theme: "Capital Outlay Workshop"— Presentation transcript:

1 Capital Outlay Workshop
December 5, 2016

2 Capital Outlay Workshop - Elementary Concurrency Service Areas
December 5, 2016

3

4

5

6

7

8

9 Capital Outlay Workshop - Relocatables
December 5, 2016

10 Inventory of Relocatables
179 Local Owned Units 78 at Elementary Schools 26 at Middle Schools 36 at High Schools 64 Leased Units 51 at Elementary Schools 9 at Middle Schools 4 at High Schools

11 Capacity of District Owned Relocatables
179 Portables (all) over 20 years Capacity of 78 Elementary = 1,185 Capacity of 26 Middle = 515 Capacity of 31 High = 700 Total Capacity of 2,400 used primarily for pull out programs, administration and special needs

12 Capacity of Leased Relocatables
64 Leased Portables Capacity of 51 Elementary = 755 Capacity of 9 Middle = 178 Capacity of 4 High = 72 Total Capacity of 1,005 used primarily as classrooms

13 Capital Outlay Workshop - Capital Outlay Needs
December 5, 2016

14

15 COP's Funding History (1994 thru 2010)
Series 1994: $15,000,000 Series 1997: $19,225,000 Series 1998: $12,640,000 Series 2001: $24,200,000 Series 2004: $20,150,000 Series 2010: $18,375,000 $109,590,000

16

17

18

19

20

21

22

23 5-year Survey Financial Summary
2005 $149,848,791 Site $11,072,000 Remodel $21,911,453 Renovate $48,179,793 New Construction $68,685,545 2011 $126,200,734 $9,540,000 $3,110,198 $95,419,097 $18,131,439 2016 $293,975,245 $7,404,000 $10,396,255 $230,180,211 $45,994,779

24

25 01 Roofing - District Priorities
Roofs in need of replacement due to exceeding the equipment year life expectancy Grand Total $4,832,500 Grand Total $4,832,500

26

27 02 HVAC - District Priorities
Mechanical and Control Systems in need of replacement due to exceeding the equipment year life expectancy Districtwide Replace 1,000 pre 1984 wall hung A/C units $3,300,000 Grand Total $8,331,590

28

29 03 Painting - District Priorities
Walls in need of repainting due to exceeding the paint year life expectancy Grand Total $3,709,552

30

31 04 Flooring - District Priorities
Floors in need of resurfacing due to exceeding the floor year life expectancy Grand Total $1,737,000

32

33 Major and Minor Projects Involving:
Master Plan and School Plant Survey Recommendations Not Included in Cyclical Estimates Major and Minor Projects Involving: ● Site Work ● New Construction ● Remodeling ● Renovation ○Windows ○Lighting ○Ceilings

34 Districtwide Needs - Not Included in Cyclical Estimates
Districtwide Needs: ● Safety-to-Life, Health & Sanitation ● Security Projects ● ADA Modifications ● Physical Education Enhancements ● Storage & Custodial Services ● Transportation Vehicle/ Bus Replacement ● Paved Parking & Drives ● Indoor Air Quality/ Environmental Issues ● Purchase of Sites ● Local Relocatable Repairs/ Moves ● Retrofits for Technology ● Technology Upgrades ● Site Improvements ● Vocational Minor Projects ○Fencing ● Energy Efficiency Upgrades ○Parking ○Drainage ○Sidewalks

35 Alachua Elementary Grand Total $7,321,805 Total $62,500 $1,047,748
Area (SF) Unit Cost Total Cost Site Work Install Security Perimeter Fencing 374' $20 $7,500 Correct Drainage $25,000 Install Security Lighting $10,000 Correct ADA Deficiencies ($827,000 - Design Matrix Report) $20,000 Construct New Service Drive - Phase IV of Master Plan Master Plan Total $62,500 Renovation Renovate Building 5 Major Project $875,000 Painting - Exterior of all Buildings 71,187 $ $65,492 Interior of all Classrooms and Hallways in Building 5 11,672 $ $12,256 Floor Covering - Replace Priority 1 & 2 flooring 21,172 $ $85,000 Additional covered walk at bus drive $1,047,748 Remodeling Building 1 - Phase II of Master Plan (north side) $920,337 Building 1 - Phase III of Master Plan (south side) $1,318,757 Builidng 1 - Phase IV of Master Plan (center 1/3) $622,300 Builidng 1 & 2- Phase V of Master Plan (Dining / Kitchen) $1,700,039 $4,561,433 New Construction Building 1 - Phase IV of Maser Plan (Kitchen, Music & Stage) $1,650,124 Grand Total $7,321,805

36 Capital Outlay Workshop - Funding Options
December 5, 2016


Download ppt "Capital Outlay Workshop"

Similar presentations


Ads by Google