Download presentation
Presentation is loading. Please wait.
1
Operations and Release Working Group
13 February 2018 Stephen J Winnie
2
Agenda Tea and coffee All 09:30-10:00 Welcome and introduction
Item Description Who Time 1. Tea and coffee All 09:30-10:00 2. Welcome and introduction Objectives for the day Stephen Winnie 10:00-10:15 3. MOSL updates Release Schedule RF restart plan Maintenance Schedule 2019 10:15-11:30 Break 11:30 – 11:45 4. Workshop Test systems data refresh Consultation results timeline 11:45 – 12:30 Lunch 12:30-13:15 5. Pipeline Changes Non-Code Changes TP Questions Industry consultation on Release Schedule 13:15–14:30 6. AOB and Wrap up. Meeting Close. 14:30 – 15:00
3
Release Management
4
Release Management – R6.0 CPW025 TCORRs to be applied to DEREG SPIDs
CPW038 Tariff Report Updates – standing data CPW040 NAPS report extension – columns for submitted transactions CPW042/DCP005 Reads MDS - add reread flag Functionality scope declared and confirmed Panel recommendation on WRC content confirmed 31 July 2018 Ofwat approval of CPW content 30 September 2018 MPS_2 deployment 19 April 2019 for TP testing TP testing to complete 10 May 2019 (plus one week Contingency) Deploy to PRD 17 May 2019
5
Release Management – R6.5 Early deployment of CPW047 requested by Panel, then CPW050 requested Consultation issued to Industry Must have no impact on 6.0 or 7.0 Would be between 6.0 and 7.0 MPS_2 deployment 28 June 2019 for TP testing TP testing to complete 19 July 2019 (plus one week Contingency) Deploy to PRD 26 July 2019 CPW047/DCP006: Meter Networks for Sub meter WHL CPW050 / DCP Long Unread meter report updates (new cols to show last non-estimated read)
6
Release Management – R7.0 DCP024 / PIP008 - Notifications for Retailers prior to T103.R submission DCP024 / PIP008 data initialisation CPW056 / DCP018 / PIP004 - SPD Cascade Erasure XSD changes for field consistency (address etc) DCP017 – remove Meter Manufacturer as mandatory in selceted transactions XSD field consistency chanes Non CMOS changes DCP019 - Provision of Credit assessment score evaluation changes DCP020 – Unsecured Credit Allowance on payment history RFI for Retailer notifications is issued Tuesday 12 February Panel recommendation on WRC content confirmed 28 February 2019 Ofwat approval of CPW content 30 April 2019 MPS_2 deployment 04 October 2019 for TP testing TP testing to complete 25 October 2019 (plus one week Contingency) Deploy to PRD 08 November 2019 (moved to avoid Settlement runs)
7
Release Management – R8.0 Panel recommendation on WRC content confirmed 31 July 2019 Ofwat approval of CPW content 30 September 2019 MPS_2 deployment 17 April 2020 for TP testing TP testing to complete 08 May 2020 (plus one week Contingency) Deploy to PRD 15 May 2020
8
Release Management – R9.0 Panel recommendation on WRC content confirmed 28 February 2020 Ofwat approval of CPW content 01 May 2020 MPS_2 deployment 02 October 2020 for TP testing TP testing to complete 23 October 2020 (plus one week Contingency) Deploy to PRD 6 November 2020 (avoid Settlement runs)
9
Systems Code versions System Version as from date PRD 5.0.4(36132)
07/12/2018 MPS 11/12/2018 MPS_2 03/12/2018
10
RF – Plan
11
RF Settlement run Required to run backlog of RF in sequence
March 2017, April 2017, May 2917 etc Panel recommended to delay the double running – March has one RF, then 2 per month starting in April. First run of March 2017 period processed. Delay in publication Follow up of second run of March 2017 period due 27 February to allow correction of any inaccuracies etc April 2017 period and beyond will be run as per the plan.
12
RF Settlement run Invoice period Month RF run originally due to be run in Month RF run to be run in Proposed G read execution date Proposed RF execution date Proposed RF publication date Apr-17 September March May-17 October April 2019 Jun-17 November Jul-17 December May 2019 Aug-17 January Sep-17 February June 2019 Oct-17 March has one RF, then 2 per month starting in April.
13
RF Settlement run Nov-17 April 2019 July 2019 02-07-19 03-07-19
Dec-17 May 2019 Jan-18 June 2019 August 2019 Feb-18 Mar-18 September Apr-18 May-18 October
14
Maintenance Schedule 2019 Published on MOSL website
Quarterly January April ** 19th & 22nd Bank Holiday ** Tuesday 22/01/2019 Tuesday 16/04/2019 PRE PROD Saturday 09/02/2019 Saturday 27/04/2018 PROD July October Tuesday 16/07/2019 Tuesday 12/10/2019 Saturday 27/07/2018 Saturday 23/11/2019 Tuesday 21/01/2020 Saturday 08/02/2020 Published on MOSL website CMOS/Training/MOSL Guidance
15
Break
16
Test Systems
17
Test System Management
MPS and MPS_2 MPS – as Production Build refreshed dataset to remove old data Retain data in system MPS_2 Production plus one Create new test data for the duration of the test process Purge after use Industry consultation – Options discussed TD SPID list supplied by TP and MOSL extract data based on SPID list TP supplies files of data to be loaded as per IDU (different format) Transaction processing LVI / MVI / HVI
18
Test System Management
In total 20 Responses were received.; 14 wholesalers 6 Retailers 5 Trading Parties preferred option 1 (Trading Parties to create new test data by transaction flow using HVI/LVI/MVI) 8 Trading Parties preferred option 2 (Trading Parties to supply new test data to MOSL in a format to be confirmed and for MOSL to load the test data into the test systems) 7 Trading parties preferred option 3 (An extract taken from Production CMOS by MOSL, based upon a set of nominated SPIDs (by Trading Party) that would be applied to the test systems by MOSL. Data to be anonymised by Trading Party transactional flows) As such Option 2 was selected. However due to the small margin MOSL will look to develop a simple extract (based on SPID) process that will feed into the Upload solution. The purge process will be deferred to prior to Release 7
19
Test System Management - Costs
Description Dev/test cost Op cost Data Loader development and test £ ,338 Ongoing Maintenance of the Data Loader £ ,000 Purge process development £ ,000 Purge process running (est 2 PA) £ ,000 total PA £ ,338 £ ,000 £ ,338 SPID extract c £10K additional
20
Lunch
21
Change Pipeline
22
Release Management – Pipeline. MO system affecting
PIP00N - Partial ISA release in May with 6.0 DCP012 - Removal of submission time failure for MPS 17, 18,19 JB to provide IMPACT ASSESSMENT. Not 1st April. May be delayed due to lack of Proposer involvement Jeremy MPS PIP001 - CSD 0301 to enhance CMOS January Panel - TBC YES PIP002 - CSD 0101 & 0105 to enhance CMOS This is primarily the T103 and WHL trans sent to RTL before T103. January panel - TBC PIP022 - Change to volume estimation NEW - Remove YVE from the read sestimation process. Thames Self Supply - Data Access changes PIP024 - NRTS - fixed volume deduction (rather than %Deduction) NEW - from TEIC - still in discussion - February Panel NWL Estimation process for Transfer Reads Reports field delimiter change to pipe DCP022 / Address line1 field length Welsh DCP023 / Domestic shared service indicator
23
Release Management – Pipeline. Non System affecting
CPM008 - distribition of OPS charges Review Market Performance Standards. Ofwat Approved - due 29 March deployent MPC Settlement Payment arrangements for retailers NEW - Business terms change - TBC YW RTL CPW012 / CPW049 / DCP OPS Charges to be split into two changes CPW049 and CPM0012. December Panel. Ofwat still not signed. TPs may not be ready by the date. CSD typo updates CSD typo updates 42 changes in CSD MPS threshold review CPM008 - Market Performance Standards Review Release in March 2019 Panel approved - not yet Ofwat approved (30/01/2019) PIP025 - MIMP Committee changes from RB to December Panel CPW046 - change threshold for Corrective Sett Runs not CMOS affecting - Release in March 2019 release target. Panel approved TDC CPW045 Service Mngt Interface compliance release in December Authority approved MOSL CPW044 Digital Certificate Compliance release in December Authority approved PIP006 - Developer Services release in May with 6.0 PIP008 - Escalated Complaints Form PIP0NN - OPS Charges. OPS charge introduction - implement by 1st April 2019 require MO Performance to create a system/process to manage this. Release in March December Panel. After next TDC meeting. PIP010 - Code inconsistency in post-RF Reconciliation Release in March pushed back Ofwat CPW041 - G read removal governance December Panel. Expect ofwat approval 23/1. Ofwat requested further clarification. NCC005 - SC ETD to be added to SC page NCC submission to have SC ETD shown on SC screen Business Stream CPW051 - MIMP Changes January Panel recommended for approval PIP023 - Second MPS review December Panel Annualised MO charges NAVs want reduced charges if not increase SPID count CONSULT - TEST DATA REMOVAL AND RELOAD Consultation issued Dec completed UU CPW052 - Alternatve Credit Arrangement publication change MOSL to publish on website PIP028 - Change to DEREG process link WR and SWR SPID DEREG to ensure dates match CASTLE CPW055 - WRC inconsistencies Awaiting Authority Approval
24
Non Code Change (NCC)
25
Additional areas for redevelopment
Non-Code Change Process Allows changes to CMOS or MOSL systems to be requested and considered Sharepoint location for submitting change requests MOSL EXTRANET / Non Code change Requests tracker ed confirmations of receipt Tracker Form of status Run consultations as per Code change CPs Submit to Panel if/when funding is required
26
NCC Tracker ID Request title Date submitted NCC Ref Category
Trading party submitted Name Describe the issue 8 MVI Peek and Dequeue extract improvements 28/12/2018 008 MVI Portsmouth Water Quentin Gallagher The recently introduced Peek and De-Queue, Expanded Notifications are not presented in a readable or searchable form, nor are they grouped by Transaction, which obliges us to export the data into an external program. This area does not provide an improvement on the LVI Notifications Portal. 7 BTD to show only specific transaction 19/12/2018 007 LVI MOSL Stephen J Winnie When open the BTD in Business Transactions, show only the specific transaction that is subject to the drill down and not the whole Document. 6 Market Operator Portal: Segregation of Notifications by environment 10/12/2018 006 Portsmouth Water use the new MOSL Market Operator Portal, Peek and De-queue facility to receive Notifications. Both Production and MPS2 Notifications follow the same route, which is inconvenient for both business users and testers. A means of choosing between Production and other environment transactions is required. 5 SC ETD Date column added to SC page 12/11/2018 005 BUSSTREAM-R Trevor Nelson Tariff Code related data can easily be misinterpreted when looking at low volume interface where tariffs have been removed or at least an end date set to a date in the past, and will affect all such instances. This includes cases where Service Components were erroneously setup at market opening and have been subsequently removed. The likely consequence of this is that customers will be charged for services they are not liable for 3 Deregistration Effective From Date 30/10/2018 003 Stephen J WInnie When a SPID is Deregistered the SPID, the date from which it became Deregistered is not shown on the Core SPID screen. 4 Occupancy Status Effective from Date 004 The Effective From date of the Occupancy Status (VACANT/OCCUPIED) is not shown on the Premise Core Data screen.
27
TP Question / Issues Meter read Discrepancy - Mark Reeves (Affinity Water) Final meter read submitted that was incorrect. Previous cyclic read rollover incorrectly set WHL amend the F read value TCORR173.W RTL remove the incorrect C read TCORR171.R
28
Industry Consultation – Release Schedule
Panel – Requested Consultation on appropriate number of releases PA as Panel would like to see changes implemented faster. Currently two major release PA – Spring and Autumn Does Industry have desire for more releases PA? Does Industry have capability for more releases PA? What times in year are suitable for releases? What lead times are appropriate for each release? Consultation from Monday 18 February to 1 March 2019
29
ORWG ORWG Meetings Move to every two months, alternating with User Forum 10 April 2019 11 June 2019 13 August 2019 CMOS Operations Calls Weekly during 6.5 testing phase – Wednesday at 16:00hrs
30
Close
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.