The U.S.S.E Status Report #1 February 2nd, 2009

Similar presentations


Presentation on theme: "The U.S.S.E Status Report #1 February 2nd, 2009"— Presentation transcript:

1 The U.S.S.E Status Report #1 February 2nd, 2009
Team #4 Description: A follower robot that will assist humans. Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera

2 Overall Need & Design Milestones
Outline 1 Overall Need & Design Milestones Recent Completed Tasks 2 Ongoing /Pending tasks 3 Upcoming Tasks 4 Functional Block Diagram 5

3 Overall Need & Design Milestones
Why is the design needed? Assistant Groceries Indoor projects Design Milestones Circuit Construction Programming Phase Casing Construction Motors Implementation Final Design Stage

4 Recent Completed Tasks
Jan 14 Jan 21 Jan 30 Jan 25 First Transmitter and Receiver Prototypes Final Adjustments on Transmitter and receiver Initialize Micro- controller Programming Connect and test circuits with micro-controller Jose, I distributed the things we accomplished into 4 tasks. The first being the circuit design ( which was used to determine the various parts to use) and the parts purchase which, of course, was based on our design of the circuit. The second task was the first transmitter and receiver prototypes. In this task we assembled our designed circuits on protoboards. The next task was the Final transmitter and receiver prototypes. In this task we fix the errors that appeared at the initial attempts of construction, and tested that the circuits functionality was within our requirements. The final task was the initial microcontroller programming. In this task we run some simple programs on the microcontroller in order to get familiarized with the way the software and development board works.

5 Ongoing/Pending Tasks
Time: March 24 Assigned: All Test Time: March 20 Assigned: All Run Code With Circuitry Time: February 24 Assigned : All Ongoing task is playing more with our microcontrollers and running the code in the compiling software Each is responsible for our own code and we will all be constructing the casing at the same time Nothing is pending we are just starting our programming phase and have just passed a milestone with the construction of the circuit Program/Casing Time: February 07 Assigned: All Software 5

6 Upcoming Tasks Encase transmitter/receiver Further Test and evaluate microcontrollers Design of exterior structure Obtain extra parts

7 Functional Block Diagram

8 Project Schedule

9 Questions ?

10 Thank You !