Download presentation
Presentation is loading. Please wait.
2
Oklahoma And the State of Solar
3
The Oklahoma Challenge
Low Energy Rates No Rebates or Incentives No Leadership No “Fomo”
4
The State of Solar
5
Bill Swapping – Retrofit Solar
Retrofit installation + Open-market solar financing = “Pay $100 to save $50”
6
Bill Swapping – Integrated Solar
Builder or community-level installation + 30-Year prime rate financing = “Pay $40 to save $50”
7
Establishing Leadership and Fostering FOMO
Through Solar-Ready and Builder Integration
8
Building Solar Ready Adequate Roof Space Vent and Skylight Placements
Conspicuous Raceways Ample Busbar Ratings and Breaker Space Smart Neighborhood Development
9
Minimal Challenges Traditional Scopes of Work No Training
Negligible Added Costs
10
Measurable Change Reduce Installation Costs
Remove Barriers to Installation Illustrate Leadership Foster FOMO
11
A Snapshot of Success 5kW @ $3.00 per Watt $15,000 installation
25-Year Financing 7% Effective interest rate $7,500 kWh per Year 9.6¢ per kWh $60/month savings $106/month financing $2.10 per Watt $10,500 installation 30-Year Financing 3.5% interest rate $7,500 kWh per Year 9.6¢ per kWh $60/month savings $47/month financing
12
Whisper Valley, TX
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.