1 Multiple Goal Decision Analysis I Chapters 13-15 in SEE Updated to MedFRS
Barry Boehm, USC-CSSE CS 510, Fall 2018 Fall 2018 © USC-CSSE

2 Topics in Multiple Goal Decision Analysis I
Net value and marginal analysis Decision rules Example Present value analysis Reconciling present and future cash flows Discounting Figures of merit Weighted sum Delivered system capability Fall 2018 © USC-CSSE

3 Marginal Analysis: Definitions
X – Activity level of an alternative C(X) – Cost of alternative TV(X) – Total value of alternative (in same units as cost) NV(X) – Net value of alternative NV(X) = TV(X) – C(X) MNV(X) – Marginal net value MNV(X) = = - dx d(NV) dC d(TV) Fall 2018 © USC-CSSE

4 Cost and Total Value TV and C Activity level x (a) TV NVmax C X1 Xmax
Fall 2018 © USC-CSSE

5 Marginal Net Value Activity level MNV = d(TV)/dx – dC/dx (b) Xmax X
Fall 2018 © USC-CSSE

6 Net Value vs. Activity Level
X1 Xmax X2 Over- investment (b) NV = TV - C X NVmax Investment Profitable Fall 2018 © USC-CSSE

7 Marginal Net Value Decision Rule
In the “profitable” segment If MNV > 0, Increase activity level If MNV < 0, Decrease activity level If MNV = 0, Activity level is optimal MNV = d(TV)/dx – dC/dx For Option B, with VT = value of each TR/sec, C(N) = N; dC / dN = 20 TV(N) = VT(840N – 40N2); d(TV) / dN = VT(840 –80N) 20 = VT (840 – 80Nmax) This sets MNV to zero. Nmax = (840 VT – 20) / 80 VT = 10.5 – 1/(4VT ) Fall 2018 © USC-CSSE

8 Optimal Number of Processors
vs. Transaction Value 10 8 6 Nmax = 10.5 – 1 /(4 VT) Nmax 4 2 VT, $K Fall 2018 © USC-CSSE

9 MedFRS TPS Decision Problem 3
Assuming use of composite option, we will acquire 5 processors/system and run option A for 2 years Which acquisition option should we choose: -A1: Rent processors for 2 years at $2400/Mo. -A2: Purchase processors for $100,000. Resell them for $50,000 after 2 years. Fall 2018 © USC-CSSE

10 Interest Calculations
Option A2 ties up $50K for 24 months How much would this be worth at an interest rate of .75%/month? V($50 K, 1) = $50 K (1.0075) V($50 K, 2) = $50 K (1.0075) (1.0075) … V($50 K, 24) = $50 K (1.0075)24 = $59,820 For any sum X, V(X, 24) = X(1.0075)24 Fall 2018 © USC-CSSE

11 Present Value Calculations
What is the present value X of the $50K we will receive in 24 months? V (X, 24) = X (1.0075)24 = $50K X = = $41,792 (1.0075)24 $50K Therefore, the present value of the A2 cost = $100,000 - $41,792 = $58,208 $50K PV ($50K, .0075, 24) = (1.0075)24 F PV (F, r, n) = (1 +r)n Fall 2018 © USC-CSSE

12 Present Value Of a future cash flow F
At an interest rate per time period r Over a number of time periods n Using the discount rate D = PV (F, D, n) = FDn F PV (F, r, n) = (1 +r)n 1 1 + r Fall 2018 © USC-CSSE

13 Present Value, Series of Cash Flows
In option A1, we pay $2400 at the beginning of each month How much is this worth in present value? PVS ($2400, D, 1) = $2400 PVS ($2400, D, 2) = $ $2400 D PVS ($2400, D, 3) = $2400 (1 + D + D2) PVS ($2400, D, 24) = $2400 (1 + D + … + D23) = $2400 (1 - D24) / (1 – D ) For D = 1/ = , PVS ($2400, 1/1.0075, 24) = $52,928 Fall 2018 © USC-CSSE

14 Present Value of a Series of Cash Flows
m equal cash flows or payments P At the beginning of each time period Constant discount rate D PVS (P, D, m) = P [(1-Dm)/(1-D)] Fall 2018 © USC-CSSE

15 Present Value Analysis Results
Simple Analysis Present Value Analysis Cost of A1 $57,600 $52,928 Cost of A2 $50,000 $58,208 Fall 2018 © USC-CSSE

16 Present Value Comparison
vs. Interest Rate 57600 55972 55640 58208 60622 50000 52908 54420 52928 51494 60 50 40 0.25 0.5 0.75 1.0% Interest rate per month Present value, $ Option A2 Option A1 Fall 2018 © USC-CSSE

17 TPS Decision Problem 4 Choose best vendor operating system
System A – Standard OS System A Plus Better diagnostics, maintenance features $40K added cost Fall 2018 © USC-CSSE

18 Alternative TPS Operating System Characteristics
Criterion System A System A Plus 1. Added Cost $40K 2. Processor overhead 200 3. Multiprocessor overhead 80 4. Measurement capability Poor Good 5. Trace capability None Adequate 6. Diagnostics, error messages 7. Maintenance support Marginal 8. Accounting system Very Good 9. Usage summaries 10. Documentation Fall 2018 © USC-CSSE

19 Meta-Decision Problems
Lower cost More insight The system decision problem Lower Cost More Stability The system analysis decision problem Fall 2018 © USC-CSSE

20 Weighted Sum Figure of Merit
Assign weight Wi to criterion i Σi Wi = 1 For each option j and criterion i, assign rating riJ (0 < rij < 10) Compute figure of merit for each option j Fj = Σ Wi rij Fall 2018 © USC-CSSE

21 TPS Operating System Figure of Merit Calculation
System A System A Plus Criterion Weight Characteristic Rating Weighted Rating 1. Added Cost 30 $0 10 300 $40K 4 120 2. Processor overhead 200 3 3. Multiprocessor overhead 15 80 45 4. Measurement capability 7 Poor 2 14 Good 8 56 5. Trace Capability None Adequate 6 48 6. Diagnostics, error msgs 60 7. Maintenance Support Marginal 40 8. Accounting system 12 Very good 20 9. Usage summaries 24 10. Documentation 5 Total 100 541 533 Fall 2018 © USC-CSSE

22 Delivered System Capability (DSC) Figure of Merit
DSC = (SC) (DC) (AV) SC: System Capability = Σ Wi rij DC: Delivered Capacity AV: Availability Fall 2018 © USC-CSSE

23 The DSC Figure of Merit Dimensionless Covers effectiveness only
SC component handles many criteria DC, AV components apply multiplicatively Fall 2018 © USC-CSSE

24 Gains from System A Plus - I
Reduction of $150K System A maintenance cost – Maintenance Support: % ($30K) – Diagnostics, Error Msgs.: 10% (15K) – Documentation (worse): -10% (-15K) $30K – Net Cost = $650K + 40K – 30K = $660K Delivered capacity increase via measurement: 5% 2400 tr/sec (1.05) tr/sec Availability increase via diagnostics, error messages, trace capability: 50% less downtime Fall 2018 © USC-CSSE

25 Gains from System A Plus - II
System Capability System A System A Plus Criteria Weight Rating Score Rating Score Basic TPS Functions 0.95 1.0 0.950 1.0 0.950 Accounting Systems 0.01 0.6 0.006 1.0 0.010 Usage Summaries 0.01 0.0 0.000 0.8 0.008 OS Documentation 0.03 0.8 0.024 0.4 0.012 Total 0.980 0.980 Fall 2018 © USC-CSSE

26 TPS Comparison: Delivered System Capability (DSC)
Criterion System A System A Plus System capability (SC) 0.980 Delivered capability (DC) 2400 2520 Availability (AV) 0.95 0.975 Delivered system capability (DSC)=(SC)(DC)(AV) 2234 2408 Cost Capability/Cost ratio $650K 3.44 $660K 3.65 Fall 2018 © USC-CSSE

27 Revised TPS Weighted Sum Analysis
System A System A Plus Criterion Weight Characteristic Rating Weighted Rating 1. System capability (SC) 40 0.980 9 360 2. Delivered capacity (DC) 30 2400 8 240 2520 270 3. Availability (AV) 0.950 7 210 0.975 Total 100 810 900 Fall 2018 © USC-CSSE

28 Comparison of Weighted Sum and DSC Figures of Merit
Delivered system capability Relative advantages Simpler More representative of many computer systems Better for assessing side effects of DC, AV factors Better for assessing wide variations in DC, AV factors Recommendation Use where DC, AV factors will not vary widely Use where DC, AV factors may vary widely Fall 2018 © USC-CSSE