Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Lecture 6 Network Layout By : Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
2
Analysis of the Network
Demographical Data Topographical Data Water Consumption Preliminary Studies Preliminary Studies Layout of the Network Data Entry Analysis of the Network Reminder ..
3
Area Study Residential Area Public Area Commercial Area
Agricultural Area Streets
4
% Area (m2) Item 100 641 Duonm Total Area 81 519,917 Residential Area 3 19,230 Public Area 4 25,640 Commercial Area 2 12,820 Agricultural Area 6 38,460 Industrial Area Streets
5
Population Density Calculation of total number of residents:
Normal Increase ( using equations) Example: - Total Area of Southern Remal = 2,754 Dounm Total population in Southern Remal in 2002 = 17,500 Total population in Southern Remal in 2008 = 29,300 Hypothetical figures Statistical Data
6
Continue.. Population in Area under consideration:
7
Population Density Saturation population
Total Residential Area = 519,917 m2 Total number of population under saturation condition = 45, ,918 = 105,639 Towers (6 floors and more) Regular Buildings (5 floors or less) 149,795 370,122 Area 8 3 Avg. no. of floors 140 170 Avg. area of flats (m2) (149,795/140) x 8 (370,122/170) x 3 # of flats 7 Avg. no. of persons/flat 59,918 45,721 No. of residents
8
Population Density Therefore, Population density= Population / Total Area = 99,435 / 641,000 = person/m2
9
Allocation steps: Draw network layout for the target year and pinpoint junctions and pipelines. Draw areas around the nodes in a way that cover the entire area under consideration. Determine the water demand type of each junction using the land use map prepared and determine the areas that are served by each junction. Calculate the number of population served by each junction (using the area and the density) Calculate the demand of each junction by multiplying the population by the average consumption per capita. Specify other types of demand and allocate them to the nearest nodes. The demand of each junction should be multiplied by a coefficient accounts for UFW in the design year.
10
Example:
11
Example:
12
Example 2
13
Network Layout:
14
Area around nodes:
15
Demand over nodes Domestic Consumption in the design year = 150L\c\day. School consumption = 3 L\pupil\day Mosque consumption = 11 L\prayer\day UFW = 30% # J Elevation ( m ) Domestic School Mosque Public Area Density Population Q # pupils # Prayers # Employees ( m² ) ( l/d ) J1 10.5 1187 0.155 184 35,880 500 7150 J21 12.3 2331 359 70,005 1000 3900 J22 12.68 4127 640 124,800 1950 J32 14.44 1988 308 60,060 1746 225 11662 184*150*1.3
16
Assignment: Network layout. Area around nodes. Demand over nodes.
Due date: 2 weeks
17
Questions