HVAC for thermal test on CLIC prototype modules in building 169 Preliminary design F. Audinet, C. Martel : Cern GS-SE-HE Wednesday, 25 th July 2012.

Similar presentations


Presentation on theme: "HVAC for thermal test on CLIC prototype modules in building 169 Preliminary design F. Audinet, C. Martel : Cern GS-SE-HE Wednesday, 25 th July 2012."— Presentation transcript:

1 HVAC for thermal test on CLIC prototype modules in building 169 Preliminary design F. Audinet, C. Martel : Cern GS-SE-HE Wednesday, 25 th July 2012

2 Localisation Cern Meyrin site – reference building 169-S-011 S-011 CLIC TUNNEL LAB

3 Initial design (temperature control only) CLIC TUNNEL LAB

4 HVAC PRINCIPLE (1) (T° + air speed) Air transfer 100 cm

5 CLIC TUNNEL LAB HVAC PRINCIPLE (2)

6 PROJECTS PARAMETERS Preliminary design : July 2012. Detail design: August 2012. InstallaltionOctober 2012. Estimated costs :300 to 350 kCHF CLIC TUNNEL LAB

7 HVAC DESIGN PARAMETERS Internal heat dissipation:6 KW Number of people:5 Variable airflow rate: from 5000 to 32000 m 3 /h Variable air speed (central section) from 0.25 to 0.8 m/s Ambient temperature:from 20 to 40°C Fresh air inlet:500 m 3 /h Filtration class:F8 CLIC TUNNEL LAB