Presentation is loading. Please wait.

Presentation is loading. Please wait.

July Plenary Closing Report

Similar presentations


Presentation on theme: "July Plenary Closing Report"— Presentation transcript:

1 July Plenary Closing Report
Month Year doc.: IEEE yy/xxxxr0 July Plenary Closing Report IEEE P Wireless RANs Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at > Apurva N. Mody, BAE Systems John Doe, Some Company

2 Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report
Month Year doc.: IEEE yy/xxxxr0 Outline IEEE WG Agenda IEEE P – Progress Report IEEE P – Progress Report IEEE P – Progress Report IEEE P802.22a – Progress Report IEEE b – Progress Report New Study Group on Amendment to IEEE P Letters of Assurance Past and Future Meetings Likely WG Motions at the March EC Meeting Apurva N. Mody, BAE Systems John Doe, Some Company

3 IEEE P802.22 WG Agenda Opening Plenary
Month Year doc.: IEEE yy/xxxxr0 IEEE P WG Agenda Opening Plenary Motions at the EC - Request the chair to make the following motions to the EC Request that EC Approve the formation of a Study Group for an amendment to the IEEE IEEE P – Project Completed. Standard published on July 1st, 2011. IEEE P – Project Completed. Standard published on November 1st 2010 IEEE – Submitted to RevCom Tutorial – None Mid-week plenary – No Mid-week Plenary Closing Plenary (Thursday, PM1, PM2) EC Meeting Apurva N. Mody, BAE Systems John Doe, Some Company

4 Month Year doc.: IEEE yy/xxxxr0 IEEE P Progress Report IEEE Standard was published in 2010 We would like to sincerely thank the members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems John Doe, Some Company

5 Month Year doc.: IEEE yy/xxxxr0 IEEE P Progress Report IEEE Standard was published on July 1st 2011. We would like to sincerely thank the members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems John Doe, Some Company

6 Month Year doc.: IEEE yy/xxxxr0 IEEE P Progress Report P Sponsor Ballot process has been completed received an approval from the EC to forward to the RevCom. The approval and response ratios can be found below: Apurva N. Mody, BAE Systems John Doe, Some Company

7 Apurva N. Mody, BAE Systems
Motion Motion for a Approval to forward the IEEE P to the IEEE SA RevCom Slide 7 Apurva N. Mody, BAE Systems

8 Motion for Approval to forward the IEEE P802.22 to the IEEE SA RevCom
Rules Motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and Working Group responses. • Schedule for confirmation ballot and resolution meeting.

9 Number of People in the Sponsor Ballot Pool = 102
Motion for a Conditional Approval to forward the IEEE P to the IEEE SA RevCom Number of People in the Sponsor Ballot Pool = 102 IEEE Sponsor / Re-circ Ballot Response Ratio Approval Ratio Negative Votes Number of Negative Comments Received Comment Resolution Status Draft Status Sponsor Ballot #1 Open – Feb , Closed – Mar 20, 2012 81% (4% abstain) 97% 2 Negative Votes with Comments 5 Comments addressed & resolved Rev4 P /D 2.0 prepared Sponsor Ballot Re-circ #1 Open – Apr. 22nd, 2012, Closed – May 7th, 2012 85% (8% abstain) 100% 0 Negative Votes Received Comments addressed & resolved – Rev4 P802.22/D3.0 prepared Open – May. 23rd, 2012, Closed – June 2nd, 2012 87% (6% abstain) No more comments to resolve P802.22/D3.0 to be sent to RevCom Slide 9 Apurva N. Mody, BAE Systems

10 Apurva N. Mody, BAE Systems
P WG Motions WG Motion #7 Document – Rev0 Move to authorize the P WG Chair and the Ballot Resolution Committee (Gerald Chouinard, Apurva Mody, Tom Gurley) to continue the comment resolution of the P comments for Draft v1.0. The Chair to issue Draft v2.0 of the P Recommended Practice and launch a 30 day Sponsor Ballot or 15 day Sponsor re-circulation ballot as he sees fit no later than April 20th. Subsequently to resolving the comments for P authorize the P WG Chair to issue further drafts and launch other rounds of re-circulation ballot, if required to meet the conditions to send the draft to RevCom. Move: Apurva Mody Second: Jerry Kalke For: 8 Against: 0 Abstain: 0 WG Motion #2 Document – Rev0 The IEEE Working Group authorizes the WG Chair to seek (Conditional) Approval from the IEEE 802 Executive Committee to forward P /D3.0 to the IEEE SA RevCom. Move: Ivan Reede Second: Dr. Chang-woo Pyo For: 8 Against: 0 Abstain: 0 Motion passes unanimously Slide 10 Apurva N. Mody, BAE Systems

11 Apurva N. Mody, BAE Systems
Motion for Un-conditional Approval to forward the IEEE P Draft Standard to the IEEE SA RevCom Move that EC grants un-conditional approval as per the IEEE 802 Operations Manual to forward IEEE P D3 to the IEEE Standards Association Review Committee. (13 EC Members present during the June 5th EC Telecon) Move: Apurva N. Mody, Second: James Gilb Any Objection for unconditional approval? No Objections MOTION PASSES Slide 11 Apurva N. Mody, BAE Systems

12 Apurva N. Mody, BAE Systems
July 2012 WG Motion to form Study Group for Amendment to the IEEE Standard for Advanced Beaconing Slide 12 Apurva N. Mody, BAE Systems

13 Apurva N. Mody, BAE Systems
July 2012 P WG Motion Members of the IEEE WG authorize the Chair of IEEE to make a motion to the IEEE 802 Executive Committee during the July EC Closing Plenary to seek an approval to form an Advanced Beaconing study group under the Working Group for an amendment to the IEEE Std Move: Jerry Kalke Second: Chunyi Song For: 9 Against: 0 Abstain: 0 Slide 13 Apurva N. Mody, BAE Systems

14 Apurva N. Mody, BAE Systems
July 2012 P EC Motion Move that the EC allows formation of an Advanced Beaconing Study Group under the Working Group for an Amendment to the IEEE Std Standard. Move: Apurva Mody Second: Subir Das For: 13 Against: 0 Abstain: 1 Motion Passes Slide 14 Apurva N. Mody, BAE Systems

15 Apurva N. Mody, BAE Systems
July 2012 References July Plenary WG Motions: White House PCAST report “Realizing the Full Potential of Government –held Spectrum to Spur Economic Growth,” - Slide 15 Apurva N. Mody, BAE Systems

16 IEEE P802.22a MIBs and Managememt Plane Procedures
Month Year doc.: IEEE yy/xxxxr0 IEEE P802.22a MIBs and Managememt Plane Procedures First P802.22a WG letter ballot is under-way. Received 42 Comments Implemented resolution of comments discussed during last face-to-face Continuing work on MIB development. Apurva N. Mody, BAE Systems John Doe, Some Company

17 IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications
2012 2013 2014 1 3 5 7 9 11 Task Group formed x Process document Functional Requirements Call for Proposals issued Selection Criteria  x Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed Comment Resolution 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot RevCom/NesCom Approval Chang-woo Pyo (NICT) March 2012

18 IEEE P802.22 Letter of Assurance
Month Year doc.: IEEE yy/xxxxr0 IEEE P Letter of Assurance The LoAs can be found on the website at as well as on the IEEE SA website Apurva N. Mody, BAE Systems John Doe, Some Company

19 IEEE 802.22 Future Sessions are planned as follows
Month Year doc.: IEEE yy/xxxxr0 Future Sessions IEEE Future Sessions are planned as follows Session Dates Location Interim Sep 16-21, 2012 Indian Wells, CA Plenary Nov 11-16, 2012 San Antonio, Tx Jan , 2013 Vancouver, BC March 17 – 22, 2013 Orlando, FL May 12-17, 2013 Waikoloa, HI Apurva N. Mody, BAE Systems John Doe, Some Company

20 Likely P802.22 WG Motions to the EC(2)
Month Year doc.: IEEE yy/xxxxr0 Likely P WG Motions to the EC(2) Request that EC Approve the formation of a Study Group for an amendment to the IEEE Apurva N. Mody, BAE Systems John Doe, Some Company

21 There are no 802.22 Tutorials for this session
Month Year doc.: IEEE yy/xxxxr0 Sponsored Tutorial There are no Tutorials for this session Apurva N. Mody, BAE Systems John Doe, Some Company

22 References IEEE WG Agenda, July Plenary, San Diego, CA. Meeting minutes, June 5th EC Telecon: July Plenary EC Closing Motions - White House PCAST report “Realizing the Full Potential of Government –held Spectrum to Spur Economic Growth,” - July Plenary WG Motions - Apurva N. Mody, BAE Systems


Download ppt "July Plenary Closing Report"

Similar presentations


Ads by Google