Download presentation
Presentation is loading. Please wait.
1
Implementation Options and Project Management
WECC DEWG EIDE Workshop
2
Goals Identify available options Describe how to manage each
3
EIDE implementation options
Can implement only certain functions In house, one programmer In house, multiple programmers Contractor/In house split Contractor only Specified as part of larger system Integration of third party EIDE implementation
4
Which methods? You can limit project scope by identifying compliance with only a few methods. Spec supports this (GetServerInfo). This may drive your method for implementation. Ensure that you can add more in the future
5
In house/one programmer
Management is relatively easy in this case Verbal communications of requirements may be adequate Single programmer is accountable for system working and performing well Ensure system documentation is produced and maintenance is possible
6
In house/multiple programmers
Specification of interfaces is required and system specification may be required Clear responsibilities/accountability for each Separation of testing/development environments Risks are mismatch of interfaces or function
7
Contractor/In House More difficult to manage
Requires specification, acceptance testing Eliminate finger pointing by clearly defining responsibilities Eliminate costs associated with misalignment of timing Set up problem reporting and classification
8
Contractor only Requires specification document
Recommend that customer and contractor produced detailed design together Plan for what happens if contractor goes away and changes are necessary Software ownership is usually negotiable
9
Specified with EMS/Scheduling
System requirements need to be provided Do detailed design with vendor Include upgrade/modifications in maintenance agreement Discuss possibility of user upgrades Timing considerations
10
What worked and didn’t discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.