Download presentation
Presentation is loading. Please wait.
1
TRACES TRAde Control and Expert System
CASCAIS Status and perspectives
2
TRACES CASCAIS 1997 CONCLUSIONS Integration of ANIMO & SHIFT:
1. User interface and application levels (avoid double data entry) 2. European server (statistics, traceability, risk assessment) Automated receipt notification of messages
3
TRACES CASCAIS 1997 CONCLUSIONS
Acknowledgment of the merchandise (transit, animal waste, animal welfare) Risk assessment tool Extension to animal products Introduction of animal identification
4
TRACES CASCAIS 1997 CONCLUSIONS
Messages for complementary information (to be standardised) Warning messages on EU imports (wrong destination, non conformity of consignment) Rejected consignments database extended (rerouted, destroyed or transformed consignments).
5
TRACES LEGAL OBLIGATIONS 1997
Council Directive 90/425/EEC on 26/06/ 1990 (Article 20): Communication system Council Decision 92/438/EEC (88/192) on 13/07/1992 (Shift rejection database) Commission Decision 92/563/EEC on 19/11/1992 (Shift import requirement database)
6
TRACES INSTITUTIONAL REQUIREMENTS
Report 1/2000 of the Court of Auditors on Classical Swine Fever Resolution A5-396/2000 of the EP on CSF; Report A5-0405/2002 of the EP on Foot-and-Mouth Disease (FMD) Commitment towards the European Parliament for the SHIFT development
7
TRACES NEW LEGAL OBLIGATIONS Food law 178/2002
Hygiene package 854/2004 Welfare regulation 1/2005 Animal Identification 1760/2000, 21/2004 Enlargement Bilateral agreements NZ,US,CA,CL
8
TRACES NEW NEEDS Connection RASFF Connecting more MS, more people
Animal health threat and rapid reaction Trade facilitation and EU bilateral accords Electronic exchanges
9
TRACES STATE OF PLAY Notification, certification, control for INTRA , CVED Help to decision (legislation, reinforced control, rejected consignment, checks) Import module 1/3 country establishment module
10
TRACES Module laboratory test Reinforced control and RASFF link
PLANNED EVOLUTION Module laboratory test Reinforced control and RASFF link Mathematical model/Risk management Fees calculation 882/2004
11
TRACES CASCAIS 2007 CONCLUSIONS To be discussed in Cascais and written
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.