1 Bicycle and pedestrian roundtable
January, 2017

2 Des Moines Parks and Recreation Colby Fangman, Park Planner
911 Trail Signage Update Des Moines Parks and Recreation Colby Fangman, Park Planner

3 911 Signage System Update - Late 2017 Volunteer Survey
- Only 17/83 (20.5%) in still place - Complete update within our jurisdiction - MPO Bike Ped Roundtable Questionnaire

4 911 Signage Questions What is Next Generation 911 (NG911)? Is there any type of trail signage system that is more or less conducive to the NG911 upgrade? Are there uniform 911 signage standards for the central Iowa trails system? If not, should there be? The fiberglass signage that Des Moines uses has not performed well. What are other entities using? Have they performed well? At what interval are 911 signage being installed at? Access point only? Line-of-sight? 1/4th mile?

5

6 STBG/TAP Applications for MPO
12 projects submitted 1 on-street facility 1 safe routes to school 1 streetscape 9 trail/shared-use path $8,549,000 requested CIRTPA applications due

7 Facebook Trail Connection
Altoona NW 25th St to NE 46th St High Trestle Trail Extension Ankeny SW Ordnance Rd. to SE Oralabor Rd US 65 Underpass Bondurant Grant St. to NE 70th Ave. 6th Ave. Streetscape Phase 2 Des Moines College Ave. to University Ave. Carlisle Trail Connection Easter Lake Spine to SE 38th St. Raccoon River Valley Trail SW 5th Bridge to Gray’s Station Mitchellville Regional Trail Connector Mitchellville Vine Ave. to Cotton Ave. Trail Connection HTT to Neal Smith Polk County NW 58th Ave. to Big Creek St Park Douglas Ave. Trail Urbandale N Walnut Creek to 100th St. Kettlestone Greenbelt Trail Phase 1 Waukee SE Parkview to Grand Prairie Pkwy. Sugar Creek Greenway Trail Phase 1 West Des Moines 95th St. to bridge at Stagecoach Dr. University Ave. Windsor Heights 63rd St. to 73rd St.

8 Process Sponsors present eligible projects to the STBG Funding Subcommittee – February 2018 STBG Funding Subcommittee presents funding recommendation to the MPO Executive Committee – March 2018 MPO Policy Committee makes final funding decision – April 2018

9 Online Input Opportunity

10 2018 APBP Webinar Selection
January: Implementing Open Streets February: Art, Placemaking and Funding March: Managing Freight in Urban Corridors April: Got Counts? Now What? May: Quick Builds – Tactical Urbanism Toolbox June: Safety Manuals – The Good Stuff July: Roundabouts that Work for Cyclists and Pedestrians August: Advisory Bike Lanes September: Placemaking in the Burbs October: Safe Routes to School November: Conflict Resolution: Sidepath Design December: Bicycle and Pedestrian Coordinators

11 Subcommittees Education and Encouragement Engineering and Design
Evaluation and Planning Policy and Enforcement