EUSERC DWG. 301 Project 14-05-05.

Similar presentations


Presentation on theme: "EUSERC DWG. 301 Project 14-05-05."— Presentation transcript:

1 EUSERC DWG. 301 Project

2 EUSERC REQUEST

3 CURRENT EUSERC DWG. 301

4 EUSERC DWG. 301 1- NOTE 1 TO READ; “This equipment may be constructed as a combination panel allowing either OH or UG service supply applications.” 2- ADD CONDUIT ON TOP TO SIGNIFIFY BOTH FEED APPLICATIONS. 3- ADD WORDING IN NOTE 2 TO READ; “Lugs shall always be placed on UG side of the meter for safety purposes. Any variation should be approved by Utility.” 4-ADD WORDING IN NOTE 2 TO READ; In OH application, conductor shall be placed as to not contact bus bars or lugs. 5- POSSIBLY ADD A NOTE STATING; Conductors shall loop to the bottom of the panel before being placed on the landing lugs.”

5 Discussion, Suggestions??
LET’S VOTE YES NO


Download ppt "EUSERC DWG. 301 Project 14-05-05."