Presentation is loading. Please wait.

Presentation is loading. Please wait.

Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.

Similar presentations


Presentation on theme: "Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate."— Presentation transcript:

1 Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate working group (DE UK? FR ES NL) focusing on the definition of stages for different types of measures. (suggestions input on the 19/2) 22 February POMESA meeting in order to discuss the conclusion prepared by the working group. EC to confirm meeting space. 23 March Written procedure, aiming at agreement on the text by the next MSCG meeting 24 April Draft schema + webform End of June Test phase July-August Final schema + webform End of September Reporting starting date 01/10/2018


Download ppt "Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate."

Similar presentations


Ads by Google