Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, 1999 4/9/2019.

Similar presentations


Presentation on theme: "Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, 1999 4/9/2019."— Presentation transcript:

1 Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, 1999 4/9/2019

2 OUTLINE . INTRODUCTION . Schedules based on time-oriented networks
. Resource Scheduling . Optimizing resource-constrained scheduling . Solutions based on mathematical optimization . Solutions based on Heuristics . Research objectives . Proposed new resources scheduling algorithm . Conclusion 4/9/2019

3 Different project’s problems. Projects duration VS project resources
. Different project’s problems . Projects duration VS project resources. . Conflict with projects. . Resource constraints in projects. . Mathematical Techniques “LINRES” INTRODUCTION 4/9/2019

4 Schedules based on time-oriented networks
CPM & PERT Assumes unlimited resources Activities Analysis based on Time Requirements Projects resources demands VS limited quantities 4/9/2019

5 Resource Scheduling Time- constrained scheduling
Manipulating the activities time within their TF. Resource-constrained scheduling Resource-constrained priority is fixed resource availability. 4/9/2019

6 Optimizing resource-constrained scheduling
Solutions based on mathematical optimization Short project duration & smoothest resource profile Solutions based on Heuristics Computer packages. 4/9/2019

7 Research Objectives To develop a new Heuristic, as close as CPM output
Test the new Heuristic performance. 4/9/2019

8 Proposed new resources scheduling algorithm
LINRES Developed using Precedence & Grantt chart Aim is optimized resource constraint & best (t) Example 4/9/2019

9 Conclusion Resource-constraints is persisting problem
Software might speedup process of LINRES The LINRES algorithm is satisfactory Further investigation is needed 4/9/2019

10 Questions ? 4/9/2019

11 Thank you ! 4/9/2019

12 Back 4/9/2019

13 Resource availability
Resource requirement Resource utilization Resource idle Project time Project time Project time Project time Back 4/9/2019