System Restoration Coordinator Subcommittee Thursday February 28th
2
2019 Spring Restoration Drill
3
2019 Spring RTO Restoration Drill
2019 PJM RTO Spring Restoration Drill will take place on Tuesday and Wednesday May 21st and 22nd Member phone checks will be conducted with PJM on Monday May 20th Alternate dates: May 28th – 29th
4
2019 Spring RTO Restoration Drill
Reason for moving it to May: Spring Seminar had extra weeks added which would have necessitated scheduling the drill late January or early February Weather concerns
5
SharePoint Overall PJM received positive feedback from the 2018 Spring Restoration Drill concerning SharePoint PJM is in the process of making improvements based on the feedback received from members At least 2 weeks prior to the drill PJM will send SRCS Representatives a brief training presentation on SharePoint
6
Spring Restoration Drill format Change
PJM is giving TOs the option to start the Drill with a partially restored system. TOs can still start from a total black out condition. Most likely PJM will work with TOs to determine where the restoration process will start based off of a point in the restoration plan May be limitations based on PJM simulator Let PJM know if you wish to start and how far along by 3/11/19
7
2019 Spring Drill Invitation
Spring Restoration Drill invitations will be issued on Tuesday, April 2, 2019 For the 2019 PJM Spring Restoration Drill, the invitations will be sent via and confirmation for participation will be completed via the PJM survey tool The invitations will NOT be issued from LMS, the transition to the new survey tool will allow for a consolidated tool and tracking for all participants Invite will be sent to the TO contacts for SRCS and the Generator Operators and System Restoration contacts listed in Resource Tracker.
8
Spring 2019 System Restoration Drill Invitation Email
TO/GO contact will be requested to click on the survey tool link to confirm participation. Participation: Yes or No Alternate phone number for participation (real time desk will be used as default)
9
Drill Invite Confirmation
Contact will receive confirmation message for participation after survey is completed AND confirmation The confirmation will include a link to the Drill Information Packet
10
eDART Updates
11
Generator Retirement Queue Example
12
Unit Details Example Unit Details Example
14
Attachment G Modification
Unit Retirement Section