Presentation is loading. Please wait.

Presentation is loading. Please wait.

Relating Effort Reporting to Project Estimation

Similar presentations


Presentation on theme: "Relating Effort Reporting to Project Estimation"— Presentation transcript:

1 Relating Effort Reporting to Project Estimation
John Win 04/28/10

2 Agenda Introduction of current process Problems with current process
Process improvement idea Benefits Q&A

3 Current Process Project estimation using COCOMO II
Weekly individual effort report Weekly progress report submission by PM

4 Problems Inaccurate input to COCOMO II
Over optimistic mentality by programmers Vulnerable to errors of misreporting and miscommunication in ER No clear indication of how many hours spend on each module Failure to understand the true cost of project

5 Proposed Idea Enhance current effort reporting system
Remove “Develop Component” activity in ER Provide capability to add project modules/FPs to the ER system Include the type of activity performed relating to module/FPs Adding new code Fix bug in existing code Rework existing code

6 Proposed Idea

7 Proposed Idea

8 Proposed Idea

9 Benefits Leverage upon existing process
Reduce mistakes from communication Allow for easy comparison between actual effort and estimated effort Clearer indicators of project health Improve student learning about effort estimation by COCOMO

10 References Barry, E. Horowitz, R. Madachy, D. Reifer, B. K. Clark, B. Steece, W. A. Brown, S. Chulani, and C. Abts (2000, January). “Software Cost Estimation with Cocomo II” (with CD-ROM). Prentice Hall PTR. Ali Afzal Malik, Barry Boehm. “An Empirical Analysis of Effort Distribution of Small Real-Client Projects”. April 15th, 2009.

11 Questions?


Download ppt "Relating Effort Reporting to Project Estimation"

Similar presentations


Ads by Google