Download presentation
Presentation is loading. Please wait.
Published byCharla Maxwell Modified over 5 years ago
1
IEEE 802.11 Regulatory SC DRAFT Teleconference Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 March 2013 IEEE Regulatory SC DRAFT Teleconference Plan and Agenda Date: Authors: Rich Kennedy, Research In Motion Rich Kennedy, Research In Motion
2
April 2009 doc.: IEEE /xxxxr0 March 2013 Abstract This presentation is the plan for the March 7, 2013 IEEE Regulatory Standing Committee teleconference. Rich Kennedy, Research In Motion Rich Kennedy, Research In Motion
3
Agenda Assign a recording secretary Administrative items
March 2013 Agenda Assign a recording secretary Peter Administrative items Required notices Reply Comments for FCC update NTIA letter regarding NPRM FCC 13-22 Review of FCC 13-22; begin developing comments Rich Kennedy, Research In Motion
4
Administrative Items Required notices Chair and Secretary
March 2013 Administrative Items Required notices Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Working Group Policies and Procedures - Chair and Secretary Chair is Rich Kennedy (BlackBerry) Peter Ecclesine will act as Recording Secretary Please send an to the addresses below to have your attendance recorded Rich Kennedy, Research In Motion
5
SC Operating Rules Anybody can vote, present, and make motions
May 2012 doc.: IEEE /0675r0 March 2013 SC Operating Rules Anybody can vote, present, and make motions Participation in SC during WG Plenary or Interim counts towards voting rights All motions must pass by a 75% majority Rich Kennedy, Research In Motion Clint Chaplin, Chair (Samsung)
6
Other Guidelines for IEEE WG Meetings
March 2013 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Rich Kennedy, Research In Motion
7
Introduction Outputs from this group must go through 802.18 Purpose
March 2013 Introduction Purpose Improve the working relationship between the technical experts and the regulatory specialists, especially when it comes to critical technical issues Scope The group will review new regulatory changes or impending changes affecting standards Each meeting will focus on the most critical issue at the time Critical Issue Focus Direct impact on IEEE current and future standards Response/Input deadlines Coordination with IEEE (RR-TAG) Coordination with the Wi-Fi Alliance Outputs from this group must go through Rich Kennedy, Research In Motion
8
Progress on Unlicensed Spectrum Changes
March 2013 Progress on Unlicensed Spectrum Changes NPRM FCC (205 pages) Comment period closed January 25th (Friday) Reply comment period closes March 12th Our comments reviewed in on 2/14 NPRM FCC (65 pages) Comment period closed February 20th Reply comment period closes March 22nd Final response agreed to last Thursday Out for ExCom review and approval as IEEE 802 response NPRM FCC (59 pages) Opening the 5 GHz band Comment period closes 45 days after publication Reply Comment period closes 75 days after publication Rich Kennedy, Research In Motion
9
FCC 12-118 Reply Comments Comment period closed January 25th
March 2013 FCC Reply Comments Comment period closed January 25th Elements developed in Vancouver As this cycle is for Reply Comments, we should use received comments to reply to with our elements Can be in support of the comment or against it We should also incorporate objections we may have with certain received comments Submitted to and reviewed by on 2/14 Edited version approved by ; out for ExCom approval Rich Kennedy, Research In Motion
10
Status of 802 FCC 12-118 Document
March 2013 Status of 802 FCC Document Last Thursday, requested some edits of our work Changing “802.11” to “802” Did not understand why we wanted FCC to minimize the amount of spectrum they allocate for TVWS; incorrect reading of our words Nothing yet from Final approved version in Rich Kennedy, Research In Motion
11
March 2013 NTIA Letter to FCC on 13-22 Requested the FCC consider additional concerns in the NPRM Rich Kennedy, Research In Motion
12
March 2013 Review of FCC 13-22 Rich Kennedy, Research In Motion
13
March 2013 FCC Comments Outline Rich Kennedy, Research In Motion
14
References NTIA letter to FCC re 13-22 NPRM FCC 13-22 March 2013
REG SC response for Reply Comments Sorted list of comment received on NPRM FCC NPRM FCC RR-TAG response for (edited 1/24/13) NTIA letter to FCC re 13-22 NPRM FCC 13-22 Rich Kennedy, Research In Motion
15
References Listed in FCC 13-22
March 2013 References Listed in FCC 13-22 Code of Federal Regulations Title 47 Part 2: Code of Federal Regulations Title 47 Part 15: Amendment of the Commission's Rules to Provide for Operation of Unlicensed NII Devices in the 5 GHz Frequency Range: FCC Enforcement Advisory, TDWR and U-NII Devices, “Enforcement Bureau Takes Action to Prevent Interference to FAA-Operated Terminal Doppler Weather Radars Critical to Flight Safety,” (TDWR Enforcement Advisory) DA : Presidential Memorandum: Unleashing the Wireless Broadband Revolution (Executive Memo) (June 28, 2010): Rich Kennedy, Research In Motion
16
References Listed in FCC 13-22 [2]
March 2013 References Listed in FCC [2] FCC, Connecting America: The National Broadband Plan at Chapter 5, available at: Omnibus Technical Report, Mobile Broadband: The Benefits of Additional Spectrum (Oct. 2010), pg 18, available at: Department of Commerce, “Evaluation of the MHz and MHz Bands Pursuant to Section 6406(b) of the Middle Class Tax Relief and Job Creation Act of 2012,”: KDB D01 – Guidance for IEEE ac and Pre-ac Device Emission Testing and KDB D02 Alternative Guidance for IEEE ac and Pre-ac Emissions Testing. These KDB documents are available at: KDB D01– UNII General Test Procedures v01r02, available at: An Assessment of the Viability of Accommodating Wireless Broadband in the 1755 – 1850 MHz Band : NTIA, Technical Report TR John E. Carroll et.al., Case Study: Investigation of Interference into 5 GHz Weather Radars from Unlicensed National Information Infrastructure Devices, Part I (Technical Report Part I), p. 1, Rich Kennedy, Research In Motion
17
References Listed in FCC 13-22 [3]
March 2013 References Listed in FCC [3] Memorandum from Julius Knapp, Chief, Office of Engineering and Technology, FCC, and P. Michele Ellison, Enforcement Bureau, FCC, to Manufacturers and Operators of Unlicensed 5 GHz Outdoor Network Equipment Re: Elimination of Interference to Terminal Doppler Weather Radar (TDWR) (dated July 27, 2010), available at: Technical Report Part I, p. 23, available at NTIA Technical Report TR , Case Study: Investigation of Interference into 5 GHz Weather Radars from Unlicensed National Information Infrastructure Devices, Part III (Technical Report III), available at: “Interim Plans to Approve UNII Devices Operating in the MHz Band with Radar Detection and DFS Capabilities”, KDB Publication No DO1. See, e.g., KDB available at: National Institute of Standards and Technology, NISTIR 6055, William C. Stone, NIST Construction Automation Program, Report No. 3, Electromagnetic Signal Attenuation in Construction Materials, available at Compliance Measurement Procedures for Unlicensed National Information Infrastructure Devices Operating in the MHz and MHz Bands Incorporating Dynamic Frequency Selection (DFS Compliance Measurement Procedures) at: Rich Kennedy, Research In Motion
18
References Listed in FCC 13-22 [4]
March 2013 References Listed in FCC [4] ETSI EN V1.6.1, Broadband Radio Access Networks; 5 GHz high performance RLAN: Zero to a Billion; ac-Enabled Device Shipments to Soar by 2015, In-Stat (February 08, 2011), available at Carrier Wi-Fi equipment market exploding to $2.1 billion by 2016, Infonetics research (May 10, 2012), available at: Amendment of Parts 2 and 90 of the Commission’s Rules to Allocate the GHz Band to the Mobile Service for Dedicated Short Range Communications of Intelligent Transportation Services, ET Docket No , Report and Order: U.S. Department of Transportation Research and Innovative Technology Administration, DSRC: The Future of Safer Driving Fact Sheet, Rich Kennedy, Research In Motion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.