Presentation is loading. Please wait.

Presentation is loading. Please wait.

SESAR 2020 – PJ05 Multiple Remote Tower Validation Open Day - DFS

Similar presentations


Presentation on theme: "SESAR 2020 – PJ05 Multiple Remote Tower Validation Open Day - DFS"— Presentation transcript:

1 SESAR 2020 – PJ05 Multiple Remote Tower Validation Open Day - DFS
29th March 2019

2 Open Day – DFS Validation Solution 3
We would like to invite you to attend the DFS Open Day on the Multiple Remote Tower Validation Exercise with focus on automation support. Friday 29th March 2019 DFS Headquarter AM DFS Campus / Heinrich-Hertz Straße Langen, Germany Please remember that you will be asked to show your ID at the DFS reception. Please note that there is a limitation on the group capacity, so please do not make any travel arrangements until your registration is confirmed. PJ05 - Multiple Remote Tower March 2019

3 Registration Please send a registration to Rainer Kaufhold until 15th February The registration should include the following information: Name Company Interest in SESAR PJ05 / Role Adress Phone Number Your registration will be confirmed by 20th February PJ05 - Multiple Remote Tower March 2019

4 Open Day - Content During this open day we would like to introduce you to the DFS/Frequentis concept and the validation on Multiple Remote Tower which was developed in SESAR PJ05. In addition you will receive an introduction to the DFS/ Frequentis Remote Tower Installation for Saarbrücken. After this introduction we would like to demonstrate the prototype. The validation is a V2 exercise based on an integrated DFS/Frequentis Prototype which runs on the DFS Tower Simulator Platform The demonstration will take place in groups as the space in the simulator is very limited. Each group has about 30 min. demonstration time. Afterwards we would like to discuss your view and answer open questions on the Multi Remote Tower concept. PJ05 - Multiple Remote Tower March 2019

5 DFS Remote Tower Project 10:30 MRTC Project Overview 11:00
Agenda Time Topic 09:00 Coffee available 09:45 Welcome 10:00 DFS Remote Tower Project 10:30 MRTC Project Overview 11:00 MRTC Validation Method 12:00 Simulator demonstration, lunch and additional presentation in groups 14:00 Discussion 15:00 End PJ05 - Multiple Remote Tower March 2019

6 Simulation Setup Simulation setup is characterised by automation support increasing ATCO situational awareness. PJ05 - Multiple Remote Tower March 2019

7 Hotel Recommendation Mercure Hotel Frankfurt Airport Langen (formerly ‚Steigenberger‘) Robert Bosch Strasse 26 63225 LANGEN Phone: +49 (0) 6103 – 9720 ACHAT Comfort Airport-Frankfurt Robert-Bosch-Straße 58 63225 Langen Phone: +49 (0) PJ05 - Multiple Remote Tower March 2019


Download ppt "SESAR 2020 – PJ05 Multiple Remote Tower Validation Open Day - DFS"

Similar presentations


Ads by Google