Download presentation
Presentation is loading. Please wait.
1
Decision-Support Tool For PSCOs
6th IMO Workshop for PSC MoU/Agreement Decision-Support Tool For PSCOs Korean Register of Shipping July 2013
2
CONTENTS 1 2 3 4 WHY DECISION- SUPPORT TOOL? WHAT IS DECISION-
▪ Current situation ▪ Necessity ▪ Application 1 WHY DECISION- SUPPORT TOOL? WHAT IS DECISION- SUPPORT TOOL? ▪ Existing Tools ▪ Contents ▪ Functions 2 3 4 ISSUES OF DECISION- SUPPORT TOOL SUGGESTION FOR DEVELOPMENT ▪ Regional Issues ▪ Technical Issues ▪ Cost-related Issues ▪ Options suggested ▪ Comparison table ▪ Maintenance
3
1 1. WHY DECISION- SUPPORT TOOL? Current Situation Necessity
Application
4
Increasing Changing Current situation Various Various Conventions
SOLAS Amendments 2010/2011 Amendments 2009 Consolidated Edition 2008/2009 Amendments 2006 Amendments 2004 Consolidated Edition 2003 Amendments 2000 Amendments 2001 Consolidated Edition 1997/1998 Amendments 1997 Consolidated Edition 1996 Amendments 1994 Amendments 1992 Amendments 1992 Consolidated Edition 1990/1991 Amendments 1989 Consolidated Edition 1986 Consolidated Edition 1974 Convention Enormous Amendments Keel Laid Date SOLAS 1992 Amendments 1992 Consolidated Edition 1990/1991 Amendments 1989 Consolidated Edition 1986 Consolidated Edition 1974 Convention + Retroactive Requirements Only need Different Implementation Various Changing Increasing Mandatory instruments have been getting more and more complex over time.
5
Current situation VAST AND COMPLEX MANDATORY INSTRUMENTS Can lead to
HEAVY WORKLOAD Frequent amendments of mandatory instruments INDIVIDUAL DISCREPANCY Discrepancies in application of regulations Can lead to LOSE OF LIFE & DAMAGE TO PROPERTY Important to apply accurate regulations to the ships
6
Necessity of Decision-Support Tool
PROMOTE EFFICIENCY REDUCE WORKLOAD CONVENIENT WORK ▪ Enhancing regional PSC activities ▪ Increasing productivity ▪ Discrepancy ▪ Human errors ▪ Time saving ▪ Easy reporting ▪ Easy searching ▪ Better understanding Solution is Decision-Support Tool For PSCOs A database system which contains most of the IMO/ILO instruments as well as regional documents to help PSCOs when inspecting the ships.
7
Application of Decision-Support Tool
Hard Copy Electronic Document Change to Inconvenient for carriage No functions on the text Can not obtain information without reading text Easy to carry Various functions on the text Provides brief information on the top of each regulation
8
Available at anytime and anywhere
Application of Decision-Support Tool Available at anytime and anywhere IN THE OFFICE Internet SERVER Available in the office using PC through internet service OUT OF OFFICE Mobile Internet SERVER Available out of office using smart phone or tablet pc ON BOARD Without Internet Available on board without internet service using Windows application
9
Application of Decision-Support Tool
Reporting by hand Reporting by electronic system Reporting System Change to Checklist Link Required to find relevant regulations by themselves Required to write or insert all the things in the report The relevant regulations will be automatically found by Checklist The relevant regulations will be inserted to the system by clicking
10
2. WHAT IS DECISION- SUPPORT TOOL? Existing Tools 2 Contents Functions
11
EMSA RuleCheck Existing Tools Version 1.0 (2007) : CD & Web Version
Version 4.0 (2010) : Check Deficiency Version 5.0 (2011) : USB Version Checklist Link Version 6.0 (2012) : Prospective EU legislations EMSA RuleCheck was developed to provide more enhanced and standardized inspection to the PSCOs in the Paris MOU regime. It has 4 main functions – Tree View, My Ship Tree, Check Deficiencies, Word Search. The Check Deficiencies function, which was developed especially for PSCOs of Paris MOU and linked to THETIS, allows an easy access to Convention references supporting deficiencies during inspections.
12
MED MOU MedRules Existing Tools
MedRules was developed in 2012 to be used by PSCOs of the Mediterranean MOU. The system is comprised of a database of all relevant IMO, ILO conventions and Med MoU PSC manual used by PSCOs. The Checklist for PSCOs of MED MOU is linked to MEDSIS which is a internal reporting system of MED MOU. ▪ Checklist function based on deficiencies of MED MOU ▪ Local documents of MED MOU ▪ Validate check of IMO number in Checklist. ▪ Ship information auto complete by inputting IMO number in Checklist
13
Contents of Decision-Support Tool
Decision-Support Tool includes vast conventions and codes which to be referred when inspecting the ships. Also it can accommodate various local regulations and PSC instructions. CONVENTION CONTAINED DOCUMENTS Regional Document CODE OTHER CONVENTIONS SOLAS, MARPOL, ICLL, STCW, MLC 2006, COLREG 1972, TONNAGE 1969, AFS 2001, BWM 2004, ETC… CODES IBC, IGC, IMDG, ISM, ISPPS, FSS, FTP, HSC, LSA, NOX, IMSBC, ETC… REGIONAL DOCUMENTS PSC Instruction, PSC Circulars, Local Regulations, ETC... OTHERS IMO RESOLUTIONS, IMO CIRCULARS, ILO DOCUMENTS, UNCLOS, ETC...
14
Functions of Decision-Support Tool
▪ The Decision-Support Tool is composed of 5 functions
15
Functions of Decision-Support Tool
TREE VIEW Access to IMO/ILO instruments as well as regional documents which to be used for PSCOs in Tree View structure Amendment Status Consolidated Edition Document Link Head Information
16
Functions of Decision-Support Tool
WORD SEARCH Easy search for documents which contains the searched words with various additional searching options Standard Search Bottom-up Search Category Search
17
Functions of Decision-Support Tool
MY SHIP TREE Customized tree view structure to be applicable only to the individual ships based on its type and construction date 3 Conventions 4 Codes Customized Tree View Retroactive Requirements
18
Functions of Decision-Support Tool
CHECKLIST Easy to find a convention reference to support any PSC defective items or Deficiency codes Criteria Selection Auto complete function Linkage function
19
Functions of Decision-Support Tool
CHECKLIST LINK Easy to insert the relevant regulations in the internal reporting system based on the found deficiencies when inspecting ships 2. Click! 3. Select regulation 1. Select Deficiency 4. Paste! In order to use this function, each internal reporting system shall be harmonized with the Decision Support Tool.
20
3. ISSUES OF DECISION- SUPPORT TOOL Regional 3 Technical Costs
21
Regional Issues LOCAL DOCUMENTS
▪ Local regulations to be applicable in the specific region ▪ PSC instructions to be applicable in the specific PSC MOU DEFICIENCIES ▪ Different defective items between each PSC MOU regime ▪ Different deficiency codes between each PSC MOU regime
22
Technical Issues SYSTEM PERFORMANCE
▪ Need to use cloud services to prevent a decline of system response time caused by a far distance between each region SYSTEM PERFORMANCE SERVER MANAGEMENT ▪ It is better to place a main server nearby system developer for the effective management of Decision-Support Tool VARIOUS ENVIRONMENT ▪ System environment that differ by region shall be considered. (Computer OS, Web browser, Server OS, Develop tools)
23
Costs-related Issues DEVELOPMENT
▪ Development period and costs can be different according to the functions to be developed ▪ Need to come up with a development model to reduce costs MAINTENANCE ▪ Expenses for updating and maintaining Decision-Support Tool ▪ Expenses for the construction and maintenance of server PC
24
4 4. SUGGESTION FOR DEVELOPMENT Table of Comparison Options Suggested
Flow Chart 4 Maintenance Table of Comparison Options Suggested
25
Options suggested OPTION 1 Database for GROUP 2 COMMON DATABASE
MOU GROUP1 MOU GROUP2 MOU GROUP3 ▪ Separately developed system based on each PSC MOU regime ▪ Customized functions based on deficiency & documents of each PSC MOU ▪ User friendly interface satisfied characteristic of each PSC MOU regime ▪ A checklist link function between checklist and internal reporting system
26
Options suggested OPTION 2 COMMON DATABASE MOU GROUP1 MOU GROUP2 MOU
Database for GROUP 1 Database for GROUP 3 Database for GROUP 2 MOU GROUP1 MOU GROUP2 MOU GROUP3 ▪ Customized checklist and local documents based on each PSC MOU ▪ Reducing the development costs by integrating as a combined system ▪ A system shall be revised in order to link between Checklist and each internal reporting system
27
Options suggested OPTION 3 COMMON DATABASE
COMMON DATABASE MOU GROUP1 MOU GROUP2 MOU GROUP3 ▪ Common functions can be applicable to the all users regardless of region ▪ Cheapest and quickest way to be used throughout the world ▪ Need to develop an additional program to link with each reporting system
28
Checklist according to IMO Resolution
Table of comparison OPTION 1 OPTION 2 OPTION 3 Main Functions (Tree View, Word Search, My Ship Tree) System version (Available offline(master copy), online) Check List based on the deficiency of each PSC MOU Checklist according to IMO Resolution Local documents of each regional group Checklist link to the internal reporting system of PSC MOU Need additional system revision Costs for development and maintenance Development period
29
Flow chart START 1M 2M 3M 4M 5M 6M 7M Deliverable Report Meeting
Analysis & Design - Functional specification - Technical requirement - DB Analysis & Design - Enterprise Architecture Design - Method Design & Verification Manual & Instruction System Revision Feedback Document Collection & Analysis Installation & Testing Data Entry & Conversion Verification Implementation - GUI Design - Coding Deliverable Process model and data model 1st Draft System Revised Final System 2nd Draft System Report Progress Report Draft technical report & Progress Report Final Technical Report Progress Report Meeting Final delivery Kick off meeting Interim meeting Pre-delivery Final meeting
30
.05 Maintenance Update Documents System Correction Update Function
Update the latest amended or replaced documents in the category System Correction Corrective actions in order to proper implementation of the system Update Function Update each function for provide more user friendly interface Contents Addition Addition of newly adopted IMO, ILO documents as well as regional documents ▪ It is important to maintain system as an up-to-date version for the swift and accurate implementation of criteria.
31
Thank you for your attention!
Any questions or suggestions, please feel free to contact us.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.