1 Update from PEAK on RAS Visualization Efforts
November 2017, RASRS Meeting WECC, Salt Lake City Mengjia (Jessie) Xiao Ronald Evjen Sarma (NDR) Nuthalapati

2 Outline PEAK’s efforts on Updating RAS displays in PEAK EMS
Creating RAS displays in PI ProcessBook BC-Hydro BPA PG&E Collaboration with entities on improving visualization of RAS

3 RAS displays in PEAK EMS

4 RAS displays in PEAK EMS
RAS displays in PEAK EMS are categorized by BA and are currently under the process of information updates, including: Scheme names Document links PI RAS display availabilities (links to PI displays) On EMS RAS displays, PEAK operators can find related RAS documents for each RAS scheme and links to related RAS PI displays if applicable.

5 RAS displays in PEAK EMS

6 RAS displays in PI ProcessBook

7 RAS displays in PI ProcessBook
Current progress: PEAK is currently focused on creating PI displays to visualize RAS trigger conditions and protective actions in BC-Hydro, BPA and PG&E areas. As of now, most of BC-Hydro RAS displays and BPA PDCI RAS display are rolled out to production environment. PG&E 500 KV RAS displays are under designing and constructing.

8 RAS displays in PI ProcessBook
Main informative items for operators on RAS displays: RAS document links; RAS IDs in PEAK RTCA and related contingency IDs; Substations with modeled generation/load shedding actions and total armed amount; Detailed arming information on which generator/load is armed for shedding; RAS triggering logic diagrams.

9 RAS displays in PI ProcessBook
Benefits it brought to PEAK real-time operation: RCs and System Operators are viewing same information during discussions; Becoming a communication platform between operators and engineers; Acting as an alternative resource for validating RTCA results; Presenting RAS logics modeled in RTCA straightforwardly; Storing total armed gen/load shed amounts in PI; PI platform allows easy updates and maintenance.

10 Peace Canyon Area – North of KELLY_LK, 500KV RAS

11 Peace Canyon Area – North of KELLY_LK, 500KV RAS – detailed actions

12 Displays for total load shedding amount and locations
Vancouver Island RAS In RTCA, Vancouver Island RAS models may be triggered together under certain trigger conditions. RAS triggering logic diagram is built for detailed explanation. Displays for total load shedding amount and locations

13 Vancouver Island RAS 500kV Tripping Logic
RAS ID in RTCA contains few line pair loss trigger conditions RAS ID in RTCA for gen shed RAS scheme RAS ID in RTCA for load shed RAS scheme

14 Vancouver Island RAS – Load Shed
Total load shedding amount for each stage. Load shedding locations for each stage

15 Vancouver Island RAS – Load Shed Locations

16 BPA PDCI RAS display BPA PDCI RAS display has been used for RC training.

17 BPA PDCI RAS display

18 Collaboration with entities
PEAK has initiated discussions with CAISO regarding PG&E PACI RAS displays. Sharing ideas of RAS visualization displays. CAISO shared PI displays used for monitoring RAS arming statues; PEAK shared PI displays draft created for presenting PG&E PACI RAS operations. Discussions are in progress.

19 Thank you! Questions? Mengjia “Jessie” Xiao, (mxiao@peakrc.com)
Ron Evjen Sarma (NDR) Nuthalapati