Presentation is loading. Please wait.

Presentation is loading. Please wait.

Network Operation-CM SSA Heads Meet 18-June-2016.

Similar presentations


Presentation on theme: "Network Operation-CM SSA Heads Meet 18-June-2016."— Presentation transcript:

1 Network Operation-CM SSA Heads Meet 18-June-2016

2 Revenue Increase Improve QoS Increase in connections
Preventive Maintenance Provisioning of missing LVDs Rectification of Faulty LVDs Rectification of Earth Resistance Optimise Existing network RF Optimisation Increase network availability by improving uptime of BTSs Improve KPIs Analyse & Act on Daily Reports, available technology wise, at Rectification of BTS Alarms Increase in connections

3 VLR-HLR Month VLR HLR VLR/HLR Jan-16 2315349 3526962 0.66 Feb-16
Mar-16 Apr-16 May-16 0.72

4 Data Usage-Giga Bytes Month Month Data Usage-GBs % Increase 2G 3G
Total Jan-16 3.00 Feb-16 -26.93* Mar-16 43.97 Apr-16 -13.81** May-16 6.48 *Jat Agitation *Fault in SGSN

5 Data Usage SSA Wise-Giga Bytes
Mar-16 Apr-16 May-16 GBs % of Total Ambala 12.4% 12.7% 15.0% Faridabad 5.2% 5.1% 4.7% Gurgaon 4.6% Hisar 11.1% 10.0% 11.4% Jind 3.6% 4.4% Karnal 11.9% 12.3% 14.0% Rewari 12.0% Rohtak 24.1% 24.5% 21.4% Sonipat 14.6% 14.8% 13.1% Total 100.0%

6 BTS Availability SSA Mar-16 Apr-16 May-16 AMB 96.46% 97.23% 96.79% FBD
95.22% 94.02% 92.70% GRG 98.18% 97.75% 96.74% HSR 96.09% 96.52% 94.45% JND 99.39% 99.51% 98.71% KRL 95.09% 95.72% 94.25% RWR 99.17% 98.86% RTK 97.29% 97.16% 97.72% SPT 98.94% 98.50% 98.01%

7 Node-Bs Availability SSA Mar-16 Apr-16 May-16 AMB 93.44% 93.74% 92.13%
FBD 95.82% 95.52% 94.79% GRG 98.24% 98.20% 96.28% HSR 94.46% 93.51% 90.86% JND 99.12% 99.22% 96.55% KRL 86.64% 85.82% 82.75% RWR 92.89% 92.14% 26.34% RTK 98.38% 98.02% 97.61% SPT 99.05% 98.61% 98.08%

8 % of cells not meeting TRAI Benchmark
TCH Drop (<=2%) SSA Tech % of cells not meeting TRAI Benchmark Mar-16 Apr-16 May-16 AMB Nokia 46.58 52.99 51.28 Ericsson 49.32 61.99 44.05 ZTE - 2.38 FBD 2.43 1.12 1.01 GRG 1.72 0.66 HSR 47.84 48.92 72.30 59.07 53.85 39.55 JND 38.37 37.17 46.43 58.33 60.00 36.67 KRL 45.99 43.98 46.90 30.85 30.42 29.98 RWR 74.63 75.12 83.94 88.51 87.93 75.86 0.00 RTK 0.79 0.49 0.20 SPT 1.09 0.22 0.44

9 % of cells not meeting TRAI Benchmark
TCH Block (<=2%) SSA Tech % of cells not meeting TRAI Benchmark Mar-16 Apr-16 May-16 AMB Nokia 5.56 11.54 3.85 Ericsson 5.85 6.04 7.99 ZTE - 10.71 FBD 0.69 1.50 1.68 GRG 1.03 0.66 1.32 HSR 4.32 6.83 21.94 3.55 4.04 4.83 JND 3.84 6.24 4.05 8.33 5.00 6.67 KRL 9.12 7.30 8.94 2.41 2.84 RWR 10.47 12.11 10.92 11.49 6.48 RTK 0.99 0.59 0.49 SPT 0.22

10 % of cells not meeting TRAI Benchmark
SDCCH Block (<=1%) SSA Tech % of cells not meeting TRAI Benchmark Mar-16 Apr-16 May-16 AMB Nokia 1.28 8.97 Ericsson 2.14 5.46 ZTE - 8.33 FBD 4.51 11.61 6.73 GRG 2.41 2.64 10.23 HSR 2.88 4.68 17.27 4.14 3.94 JND 0.72 4.08 3.10 3.33 13.33 KRL 2.92 5.11 6.57 0.66 1.09 3.06 RWR 3.27 5.07 3.25 8.05 47.13 24.14 21.30 RTK 0.79 2.37 4.55 SPT 0.22 19.87 1.53

11 RF Optimisation Status QE 31-3-16
SSA Number of RF Optimisation Done 2G-BTSs Node-Bs 2G BTSs %2G BTSs %Node-Bs Ambala 247 129 0.0% Faridabad 90 58 100.0% Gurgaon 97 61 Hisar 422 93 Jind 159 17 Karnal 334 148 Rewari 259 67 222 85.7% Rohtak 331 223 309 169 93.4% 75.8% Sonipat 152 103 132 86.8% Total 2091 899 1009 475 48.3% 52.8%

12 RF Optimisation Status - Current Quarter PE 31-5-16
SSA Number of RF Optimisation Done 2G-BTSs Node-Bs 2G BTS %2G BTS %Node-Bs Ambala 247 133 6 2.4% 0.0% Faridabad 102 58 100.0% Gurgaon 101 61 71 42 70.3% 68.9% Hisar 422 93 Jind 160 18 96 60.0% Karnal 339 148 Rewari 263 68 60 20 22.8% 29.4% Rohtak 334 223 202 139 60.5% 62.3% Sonipat 154 103 97 64 63.0% 62.1% Total 2122 905 634 341 29.9% 37.7%

13 LVD Status on 16-6-16 SSA Checked Excluding IP Faulty Not Available
Rectified Provided Pending Faulty Pending NA Ambala 194 138 9 85 5 53 4 Faridabad 80 32 28 Gurgaon 75 Hisar 273 70 76 7 69 Jind 131 23 15 19 12 3 Karnal 225 105 11 90 Rewari 212 2 Rohtak 204 40 6 30 10 Sonipat 104 50 Total 1498 458 128 372 37 86 91

14 Earth Resistance Status on 16-6-16
SSA Sites checked Excluding IP Within limit (< 0.5 Ohm) Outside Limit (>= 0.5 Ohm) Rectified Pending Ambala 194 124 70 33 37 Faridabad 80 65 15 Gurgaon 75 Hisar 273 119 154 105 49 Jind 131 79 52 9 43 Karnal 225 176 Rewari 212 191 21 17 4 Rohtak 204 167 36 1 Sonipat 104 63 41 Total 1498 932 566 252 314

15 INDUSTRIALAREA21/kamlakanda PANCHYAT GHAR , BHATTU KALAN
Blocked BTSs SSA Number Make 2G-3G Site Name Site ID AMBALA 2 Ericsson 2G MOD_TOWN2 AMB002A INDUSTRIALAREA21/kamlakanda YAM021A Faridabad 1 ZTE roopraka(34) Z2FBPWLP7UTA034 HISAR 10 Nokia KHEDAR_57 NHRHSP7KDR001 CHINDER CHI001A ELENABAD CITY-2 EBD002A J.G COLLEGE SEC-20 SEC020A RSD_CLOLONY SIR019A TARA BABA KUTIA TBK002A DAYER DYR001A PANCHYAT GHAR , BHATTU KALAN JDB001A KUMARIA KMR001A SHERPURA SPU001A Jind Kaberchha NHRJDP7KBA001 Bitani NHRJDP7BIT001 Karnal 8 JAMBHA_17 NHRKRP6JMH001 KATLAHERI_75 NHRKRP6KTH001 SONGAL_16 NHRKRP6SGL001 Rohera NHRKRP7ROR001 Ajrana Kalan_34 NHRKRP7AJR001 Kailash Nagar KUR012A BJAJCARPETPANPT3 PNP003A KUTNIRDPNPT-10 PNP010A Rohtak Meham-II 2G Z2ROMHMP7MHM086 3G Meham-II 3G Z3ROMHMP7MHM424

16 Cards/PP Modules supplied by M/s.EIL
SSA RU cards PP Modules (50A) Delta Hissar 18 6 Rohtak 10 Ambala 26 5 Rewari 24 Karnal 28 22 Sonipat Jind 1 12 Gurgaon Faridabad 7 Total 97 68

17 CDMA Wi-Max Issues Queries raised by BSNL HQ for closure of loss making CDMA service awaited from GRG & SPT SSAs. References: GM (CMO)/OPN/WLL Genl/10-11/Vol.-II dated / IFWT/NIC/RUIM connection sales monthly report pending from all SSAs since Jan-16 References: GM(CMO)/ HR/ CDMA/ General Correspondence/ KW/ 11-12/ 155 dated / Latest updated list of Nodal officers of CDMA and Wimax required for various reports. Pending from FBD, RWR, RTK & SPT SSAs.

18 Thanks


Download ppt "Network Operation-CM SSA Heads Meet 18-June-2016."

Similar presentations


Ads by Google