Download presentation
Presentation is loading. Please wait.
1
Seyoung Han / Ewha Woman’s Univeristy
Maintenance work Seyoung Han / Ewha Woman’s Univeristy 梨花女子大学校
2
MuTr RX/TX Board Debugging
Performed in John Haggerty’s test bench (Minjung, Seyoung, Takeru, Kwangbok) MUTR TX board GTM FEE RX board DCM electrical optical
3
Rx, Tx board test Test each slots from J1 to J5 Rx board good boards
total 9 good board labeling as RX #1 bad board : got the bad slots total 3 bad board labeling as RX #101 Tx board : 6 boards are all good and labeling as TXB #1
4
North Station 3 ?
5
North station 3 20 Pin block connector
even numbers of pins should be grounded to the chamber frame some octants have not grounded pins octant 3, 4, 5, 6, 8 ground connections are all good : 7 has to be tested octant 1 gap 2 pin 2 was not grounded with chamber frame pin 4, 6, 8, 10, 12, 14 has 489kΩ with chamber frame pin 16, 18, 20 has grounded pin 2 to 4 has infinite resistance / pin 14 to 16 has 489kΩ octant 2 gap 2 pin 2, 4, 6 has 1MΩ with chamber frame and others
6
Solution Install Jumper Cables at block connector for adequate Grounding between anode cards and frame ground To be tested Shorting Shield wire and GND cables at HV end. (May improve noise by 1 ADC ch or so.)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.