JRA2 Quality Assurance Geneviève Romier CNRS-UREC
French Federation meeting, 11 June 2004 JRA2 Quality Assurance Geneviève Romier CNRS-UREC EGEE is a project funded by the European Union under contract IST
2
Contents JRA2: Quality objectives
Quality Management (QAM) people & mandate Quality Group (QAG) people & mandate Main steps done and on going Next steps to be done French Federation meeting, Lyon, 11/06/
3
JRA2: Quality objectives
Ensure that processes, products and operation services conform to EGEE requirements and to the required level of services. QA will be present right from the start in all activities with commitments for all members. QA is an iterative process with continuous measurements and refinements in order to improve the global quality system. Measurements and metrics are needed to verify and prove that we deliver the quality that we must reach French Federation meeting, Lyon, 11/06/
4
French Federation meeting, Lyon, 11/06/04 - 4
5
JRA2: QAM The Quality Assurance Management team has a dedicated interface for each activity (3FTE): Gabriel Zaquine - CSSI: QA head + NA1, NA5 & SA1 interface Alberto Aimar - CERN: Deputy + JRA1 interface Genevieve Romier – CNRS (half-time): SA2, JRA3 & JRA4 interface Marcel Soberman – CNRS (half-time): NA2, NA3, NA4 interface Elodie Sanchez - CNRS: Metric reports and associated tools Mandate: Coordination of the overall Quality Activities French Federation meeting, Lyon, 11/06/
6
QAG The Quality Assurance Group has dedicated representative(s) (QAR) from each activity: NA1/NA5: Bob Jones - CERN NA3: Dave Berry - NESC NA4: Vincent Breton - CNRS SA1: Alistair Mills - CERN SA2: Jean-Paul Gautier - CNRS JRA1: Alberto Di Meglio – CERN JRA3: Martjin Steenbakkers - NIKHEF JRA4: Sophie Nicoud - CNRS Mandate: Make sure QA materials (procedures, metrics, tools, …) are provided by each activity Make sure QA measures as defined are applied inside their activity Promote QA materials and “production quality attitude” inside their activity Monthly meeting (conf. Call) - First Friday of each month, 10:00 French Federation meeting, Lyon, 11/06/
7
Main steps done and on going
Timesheet & reporting procedure: simpler timesheet – on going PPT customisation for EGEE: on going Risk Management procedure: on going Review of the existing QA materials Documentation plan, EDMS structure, activities web sites... Preparation of the deliverable DJRA2.1 (Quality Plan) each activity has identified its main procedures, main tools, metrics, verification means and checklists each activity is writing its own Quality Plan It defines the quality measures that shall apply within the Activity, throughout the project. French Federation meeting, Lyon, 11/06/
8
Quality Plan 1. INTRODUCTION 2. QA ORGANISATION
3. PROJECT OVERALL PROCEDURES, PLANS, STANDARDS AND GUIDELINES 4. ACTIVITY SPECIFIC PROCEDURES, PLANS, STANDARDS AND GUIDELINES 4.1. Documentation 4.2. Standards and Guidelines 5. MEASUREMENT 5.1. Basic metrics 5.2. main indicators to be reported in the quarterly report 6. FORMAL REVIEW AND AUDIT PLAN 6.1. EU deliverables review 6.2. Complementary review within the activity 6.3. Audits 7. VERIFICATION, EVALUATION AND TEST 8. TOOLS, TECHNIQUES, AND METHODOLOGIES 9. ANNEX: SOME TARGET VALUE EXTRACTED FROM THE TA 10. ANNEX: JRA2 PROPOSAL: MAIN INDICATORS TO BE REPORTED IN THE QUARTERLY REPORT (EXTRACTED FROM QAG CORK CONFERENCE). French Federation meeting, Lyon, 11/06/
9
Crossgrid monitoring tools
The tools are now implemented on a UREC/CNRS server at CCIN2P3, Lyon After LCG agreement, monitoring tests started First results next slide. French Federation meeting, Lyon, 11/06/
10
French Federation meeting, Lyon, 11/06/04 - 10
11
Next Steps to be done Determination of the type of the metrics: (QAR within each activity) “internal” use or “delivrable” use the internal metrics should help the daily work of the activity the “delivrable” metrics (indicators) are parts of the quaterly reports and should provide high level measurements from Services provided & utilisation Products provided Project progress, effort, cost International recognition Organization of the verifications: (QAM and QAR) all procedures and tools are really implemented and used all metrics are really measured, collected verification means and checklists correctly applied French Federation meeting, Lyon, 11/06/