Download presentation
Presentation is loading. Please wait.
1
Accountability & Quality Update
All ACCESS 2.0 Test Results- May 23rd Disclaimer Statement-Data is NOT official until printed on NCDPI ISR paper OR an certification from DPI. Spring/EOY Roster Verification- Teacher Verification- April 23-May 20 School Verification- May 21-June 3 District Verification-June 4-30 Homebound Students When a teacher of record (PowerSchool) is NOT the homebound teacher, the Teacher of Record claims 50% of instruction and Homebound Teacher claims 0%. The student is under claimed. If the homebound teacher is the teacher of record, the teacher should claim 100% of instruction or per PowerSchool enrollment. OCS/NCVPS course taught jointly require the OCS teacher to claim 50% of the instructional assignment. ASW/NCFE- Update and Survey Elementary/Middle EOG/Extend I 3-8 Test Plans Due- May 12th, at noon Testing Window-May 26-June 9 High EOC/NCFE/CTE/Extend I Grade 10 Test Plans Due-May 19th, at noon Testing Window- June 3-June 9 Cohort Graduation Rate, WorkKeys, EXPTEST and HIST Audits. Credit Recovery-XR and Mid-year Promotions Transfer and Drops (Documentation)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.