Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITU-R Liaison Group Report - Session #52 Closing Plenary

Similar presentations


Presentation on theme: "ITU-R Liaison Group Report - Session #52 Closing Plenary"— Presentation transcript:

1 ITU-R Liaison Group Report - Session #52 Closing Plenary
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /072 Date Submitted: Source: Reza Arefi Voice: Intel Corporation Venue: Session #52 Closing Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to closing plenary of the WG containing report of the activities during the week Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 The group had four meetings
ITU-R Liaison Group ITU-R Liaison Group was authorized by the WG at the opening plenary to submit contributions to on: IMT-Advanced technical requirements and evaluation criteria updating IMT-2000 roadmap in ITU-R WP 5D The group had four meetings Monday PM, Tuesday AM, Wednesday AM, Thursday AM

3 Report of the week – IMT-Advanced
The group approved three liaison letters on IMT-Advanced and sent to for their review L /067 on IMT.TECH L /069, L /070 on IMT.EVAL incorporated majority of our input into the following documents d5 d5

4 d5 A couple of issues arose in with respect to input on IMT.TECH that are being brought up to the attention of the WG Normalized peak spectral efficiency of 7 bit/s/Hz versus 8 bit/s/Hz proposed by Intra-frequency maximum handover interruption time of 50 ms versus 30 ms proposed by

5 Motion 1 To authorize the Chair to submit, or support the submittal of, documents d5 and d5 to the EC. Moved by: Reza Arefi Second: Result:

6 Report of the week – IMT-2000
The group also approved an input contribution to ITU-R WP 5D on updating IMT-2000 roadmap and sent to for their review L /068 approved our contribution with no change

7 Motion 2 To authorize the Chair to submit, or support the submittal of, document L /068 to the EC Moved by: Reza Arefi Second: Result:


Download ppt "ITU-R Liaison Group Report - Session #52 Closing Plenary"

Similar presentations


Ads by Google