Presentation is loading. Please wait.

Presentation is loading. Please wait.

PCB Impairment Assessment/ Conceptual Model

Similar presentations


Presentation on theme: "PCB Impairment Assessment/ Conceptual Model"— Presentation transcript:

1 PCB Impairment Assessment/ Conceptual Model
Jay Davis SFEI CEP-funded IA/CM report just beginning, but we already have… Draft PCB TMDL Project Report RMP mass budget work Food web modeling providing linkage The following are preliminary thoughts on content of the IA/CM report Illustrations by Steve Curtis

2 IMPAIRMENT INDICATORS FOR PCBS

3 TRENDS AND PREDICTIONS FOR PCBS
50% decline in the past 20 years Load reductions are predicted to accelerate recovery significantly Predicted change in mass over time Year 10 20 30 40 50 60 70 80 90 100 We are here We want to be here 20 kg 0 kg 40 kg

4 Delta Outflow

5 Nonurban runoff

6 Dredging

7 Effluents

8 Contaminated Sites

9 Buried Sediment

10 Urban Runoff

11

12

13 Your feedback is encouraged
Draft report in July


Download ppt "PCB Impairment Assessment/ Conceptual Model"

Similar presentations


Ads by Google