Download presentation
Presentation is loading. Please wait.
1
Configuration and Tests
LYRA the Lyman-alpha Radiometer onboard PROBA-2 LYRA Detectors: Configuration and Tests Ground Segment Progress Meeting BELSPO Brussels 09 Jan 2007
2
Selected configurations
filter detector nominal FWHM measured 1-1 Ly XN + MSM /- nm nm 1-2 Herzberg + PIN nm nm 1-3 Aluminium + MSM nm (1)-2.4, nm 1-4 Zr (300nm) + AXUV20D 1-20 nm (1)-1.3, 6-15 nm 2-1 Ly XN + MSM /- nm nm 2-2 Herzberg + PIN nm nm 2-3 Aluminium + MSM nm (1)-1.4, nm 2-4 Zr (150nm) + MSM nm (1)-1.3, 6-12 nm 3-1 Ly N+XN + AXUV20A /- nm nm 3-2 Herzberg + PIN nm nm 3-3 Aluminium + AXUV20B nm (1)-2.4, nm 3-4 Zr (300nm) + AXUV20C 1-20 nm (1)-1.3, 6-15 nm
4
Tests (BESSY campaigns)
Flux linearity Stability, drift LEDs, dark current Expected signal, purity Homogeneity, flatfield Integration time
5
Summary of Results Linearity Stability LEDs Signal, Purity
1-1 MSM 1-2 PIN 1-3 MSM ? 1-4 AXUV ?? 2-1 MSM 2-2 PIN 2-3 MSM ? 2-4 MSM ?? 3-1 AXUV 3-2 PIN ? 3-3 AXUV ? 3-4 AXUV ??
6
Recommendation Head 2 should be nominal
Head 1 should be used once a week Head 3 should be used once a month … depending on the behaviour of LYRA (deterioration etc.) Consequences for telecommanding and commissioning?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.