Presentation is loading. Please wait.

Presentation is loading. Please wait.

Thomas Nilsson, CERN EP/IS

Similar presentations


Presentation on theme: "Thomas Nilsson, CERN EP/IS"— Presentation transcript:

1 Thomas Nilsson, CERN EP/IS
ISOLDE scientific co-ordinator’s report INTC February Thomas Nilsson, CERN EP/IS Misc. items 2003 schedule

2 Misc. coordination items
Off-line REX development Separator training (24 part. Dec. 2-13) Hall 275 nearing completion – Class C lab Enclosed area for SSP taken into operation Move of other activities started

3 ISOLDE schedule 2003 181 days of operation (192 in 2002)
450 RIB shifts requested, attempt to schedule > 350 Large flexibility needed – (could in some cases be better…) Push-pull or parallel mode Crucial parameters and ? RILIS manpower (~200 shifts) MINIBALL campaigns – discussed with MB collaboration TONNERRE beam line allocation REX 3.1 MeV upgrade Not yet possible to fix schedule for full 2003! NB – some planned runs conditional of today’s meeting.

4

5

6

7


Download ppt "Thomas Nilsson, CERN EP/IS"

Similar presentations


Ads by Google