Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019
2
Progress made Found our second connectorized PD from central receiving
Tested Rx and Tx with optical attenuation Discovered the new PD is flawed Setting up for alignment tolerance 4/6/2019
3
Updated Schedule 4/6/2019
4
Test Results Designed Rx with Tx of GDS1250 10 dB 5 dB 4/6/2019
5
Test Results Designed Tx with Rx of GDS1250 10 dB 5 dB 4/6/2019
6
More Test Results Loopback Test 10 dB 5 dB 4/6/2019
7
Anticipated Progress for Week 14
Alignment tolerance to determine if unconnectorized PD yields better results Construct Run 1 Bill of Materials Choose between Run 2 or connectorized PD 4/6/2019