Presentation is loading. Please wait.

Presentation is loading. Please wait.

TIB contribution for the X5 - May 2003 Test Beam

Similar presentations


Presentation on theme: "TIB contribution for the X5 - May 2003 Test Beam"— Presentation transcript:

1 TIB contribution for the X5 - May 2003 Test Beam
C. Civinini On behalf of the TIB Community 4/11/2019 C. Civinini INFN-Firenze

2 C. Civinini INFN-Firenze
Outline Why to be in this beam test? TIB System Test and Test Beam interplay Equipment What to measure? 4/11/2019 C. Civinini INFN-Firenze

3 C. Civinini INFN-Firenze
Motivations System Test validation by using 25 ns beam mips Measurements with full optical readout Power Supply prototypes tests (100 m cables) (Almost) Final TIB Layer-3 shell mechanics 4/11/2019 C. Civinini INFN-Firenze

4 TIB System Test and Test Beam interplay
All components will be already debugged and System Test Modules At least 2 strings of 3 modules each Electronics AOH 1 Electro-optic converter (may be one more) 2 FED (may be one more) Digital Optical-link 1 FEC 2 CCU25 1 TSC 2 Mother cables (or more) 4/11/2019 C. Civinini INFN-Firenze

5 C. Civinini INFN-Firenze
System Test 4/11/2019 C. Civinini INFN-Firenze

6 C. Civinini INFN-Firenze
System test (2) 4/11/2019 C. Civinini INFN-Firenze

7 C. Civinini INFN-Firenze
System test (3) 4/11/2019 C. Civinini INFN-Firenze

8 C. Civinini INFN-Firenze
Mechanical Structure Ventilation Beam Vetronite Cover Box 1 meter Pedestal Basement Cover locks 60 cm 4/11/2019 C. Civinini INFN-Firenze

9 C. Civinini INFN-Firenze
Shell movements (La Guillotine) 4/11/2019 C. Civinini INFN-Firenze

10 Measurements with full optical readout
Standard tests with (almost) final readout S/N Cluster width Inter-strip cross-talk Inclined tracks Overlap between modules Noise correlations High density environment (jet like) Signal vs hit position Etc … 4/11/2019 C. Civinini INFN-Firenze

11 C. Civinini INFN-Firenze
Monitoring On-line Fast feedback during debugging phase Some volunteers available On-site Crucial feedbacks to the data taking Experience from past Test Beams Support to the general analysis for the 3 systems (TIB, TEC and TOB) See Ian’s talk 4/11/2019 C. Civinini INFN-Firenze


Download ppt "TIB contribution for the X5 - May 2003 Test Beam"

Similar presentations


Ads by Google