Download presentation
Presentation is loading. Please wait.
1
Fall Regional Curriculum and Instruction Meeting
September 2015 This template is in wide-screen format and demonstrates how transitions, animations, and multimedia choreography can be used to enrich a presentation.
2
Alabama’s ESEA Flexibility Waiver Was Approved—June 2013
Implementation of Alabama’s ESEA Waiver and the New Accountability Model—June 2013 Alabama’s ESEA Waiver Was Due to Expire—June 2015
3
June 30, 2015, Alabama’s Waiver Was Due to Expire; A renewal was needed…
The Alabama State Department of Education (ALSDE) Solicited and Reviewed Feedback from Stakeholders Across the State – March to May 2015
4
The ESEA Waiver Draft Renewal Was Submitted – April 2015
5
The Final Redlined Renewal Was Submitted – July 2015
The Renewal Was Approved August 2015
6
Changes From the ESEA Waiver to the ESEA Renewal
Modified Accountability Model to Put Emphasis on Alabama 2020 Learners and Alabama 2020 Support Systems Modified Assessment Timeline Modified Annual Measurable Objective Calculations Modified Reward School Criteria Modified Priority Support and Focus Support Exit Criteria and Incorporated a Process for Evaluating Support for Schools Expounded on Support for Schools with EL and Special Populations Removed School Performance Index Removed College- and Career-Readiness as an AMO Indicator
7
Changes From the ESEA Waiver to the ESEA Renewal
Removed Learning Gains as an AMO Indicator Removed Educator Effectiveness as an AMO Indicator Removed Gap as an AMO Indicator Removed Program Reviews and Local Indicators as AMO Indicators Removed Five-Year Cohort from Graduation Rate Measurement Removed Designation of Priority Districts Removed A-F Law from Waiver Modified Educator Effectiveness System
8
Changes will have a positive impact towards Alabama’s PLAN goal to ensure every child graduates college- and career-ready.
9
Alabama’s ESEA Accountability Model
PLAN 2020 Accountability Model AMO Reports A-F Report Cards
10
Overview of Alabama’s ESEA Accountability Model
Alabama 2020 Learners Achievement (Reading/English Language Arts and Mathematics) Alabama 2020 Support Systems Graduation Rate (Schools With a Grade 12 and Districts) Attendance Rate (Schools Without a Grade 12 and Districts)
11
Overview of Alabama’s ESEA Accountability Model
The two priorities of the Alabama ESEA Accountability Model, Alabama 2020 Learners and Alabama 2020 Support Systems, are anchored in college-and career-readiness for all students. This model will continue annual reporting of disaggregated student outcome measures for all ESEA subgroups in required content areas.
12
Alabama’s ESEA Accountability Model
Achievement Attendance Rate (Schools Without a Grade 12 and Districts) Graduation Rate (Schools With a Grade 12 and Districts) START Alabama’s ESEA Accountability Model
13
Indicators and Data Sources Alabama’s ESEA Accountability Model
Grade Range Achievement Attendance Graduation Rate Elementary ACT Aspire (reading and mathematics) Alabama Alternate Assessment (reading and mathematics) Attendance Rate Secondary ACT Plan ( and ) (English and mathematics) ACT Aspire 10 (beginning ) (reading and mathematics) Alabama Alternate Assessment (reading and mathematics) 4-Year Cohort
14
Indicator Descriptors
Achievement will be determined based on the percentage of proficient students in the areas of reading/English language arts and mathematics. The Attendance Rate is the Average Daily Attendance for the entire school year for schools without a grade 12 and districts. The Graduation Rate is the 4-year graduation rate cohort for schools with a grade 12 and districts. Graduation rate data is reported one year in arrears.
15
Annual Measurable Objectives
Annual Measurable Objectives (AMOs) are annual targets set to show increases in school/district performance over time.
16
Alabama’s ESEA Accountability Model Indicators and Baseline Years
Achievement Attendance Rate Graduation Rate
17
Achievement Annual Measurable Objective 2013-2014
Achievement AMOs were established using the state average proficiency rate for each subgroup. Schools and districts were required to meet or exceed the state average in order to meet its AMO for each subgroup in reading/English language arts and mathematics. Data sources for achievement included the ACT Aspire, ACT Plan, and Alabama Alternate Assessment.
18
Achievement Annual Measurable Objective 2013-2014 Reading/English Language Arts Example
State Average ( ) Reading/Language Arts School ABC Percent Proficient Reading/English Language Arts 55% 49% School ABC did NOT meet its Reading/English Language Arts AMO because it did not meet or exceed the state average.
19
Beginning
20
Achievement Annual Measurable Objectives 2014-2015
(AMOs) are calculated based on the goal of reducing by half the difference between the baseline year and the Performance Proficiency Goal (PPG). Performance Proficiency Goal (PPG) represents the 90th percentile proficiency score plus the average growth of the “all students” subgroup.
21
State Achievement PPGs for AMO Goal Establishment
Determine the proficiency score at the 90th percentile for the “all students” subgroup. Add the average increase for the subject area. This will establish the performance proficiency goal utilized for all applicable subgroups. (Subgroups have an n-count of 20 students or more.)
22
ELA and Mathematics Performance Proficiency Goals
70% 3-8 English Language Arts 62% High School Mathematics 35% High School English Language Arts 80% PPG This slide can be used as a background before the presentation begins.
23
State Achievement AMO Establishment
Establish actual percent proficiency of the identified subgroups. Subtract actual percent proficiency from the appropriate PPG. Divide the answer from step #2 by two. Divide the answer from step #3 by six. The answer from step #4 is the annual improvement target. Add the annual improvement target to the baseline to establish the year one ( ) AMO goal. Add the annual improvement target to the year one AMO to establish the year two AMO. Continue to add annual improvement target to each AMO until six years of AMOs have been established.
24
State 3-8 Mathematics AMOs
Subgroup Baseline All Students 41.02 43.44 45.85 48.27 50.68 53.10 55.51 American Indian 47.98 49.82 51.65 53.49 55.32 57.16 58.99 Asian/Pacific Islander 71.41 72.81 74.21 75.61 77.01 78.41 79.81 Black 23.69 27.55 31.41 35.27 39.13 42.99 46.85 Hispanic 32.48 35.61 38.73 41.86 44.99 48.11 51.24 LEP 24.29 28.10 31.91 35.72 39.53 43.34 47.15 Multi-Race 42.94 45.20 47.45 49.71 51.96 54.22 56.47 Poverty 29.57 32.94 36.31 39.68 43.05 46.42 49.79 Special Education 18.78 23.05 27.32 31.59 35.85 40.12 44.39 White 52.29 53.90 57.12 58.73 60.34 This slide can be used as a background before the presentation begins.
25
State 3-8 Reading AMOs Subgroup Baseline 2013-2014 2014-2015 2015-2016
All Students 39.78 41.63 43.48 45.34 47.19 49.04 50.89 American Indian 47.28 48.51 49.73 50.96 52.19 53.41 54.64 Asian/Pacific Islander 61.82 61.84 61.85 61.87 61.88 61.90 61.91 Black 23.98 27.15 30.32 33.49 36.65 39.82 42.99 Hispanic 25.87 28.88 31.89 34.90 37.91 40.92 43.94 LEP 10.25 14.56 18.88 23.19 27.50 31.81 36.13 Multi-Race 39.75 41.60 43.46 45.31 47.17 49.02 50.88 Poverty 28.00 30.83 33.67 36.50 39.33 42.17 45.00 Special Education 15.66 19.52 23.38 27.25 31.11 34.97 38.83 White 49.36 50.41 51.47 52.52 53.57 54.63 55.68 This slide can be used as a background before the presentation begins.
26
State High School Mathematics AMOs
Subgroup Baseline All Students 22.07 23.15 AMO targets to be reset using data from new assessments in American Indian 23.49 24.45 Asian/Pacific Islander 54.00 55.00 Black 7.52 9.81 Hispanic 13.25 15.06 LEP 5.35 7.82 Multi-Race 29.59 30.04 Poverty 10.66 12.69 Special Education 11.38 13.35 White 29.47 29.93 This slide can be used as a background before the presentation begins.
27
State High School English Language Arts (ELA) AMOs
Subgroup Baseline All Students 64.21 65.53 AMO targets to be reset using data from new assessments in American Indian 71.72 72.41 Asian/Pacific Islander 79.26 79.32 Black 44.11 47.10 Hispanic 50.20 52.68 LEP 15.18 20.58 Multi-Race 63.79 65.14 Poverty 49.95 52.45 Special Education 16.32 21.63 White 75.21 75.61 This slide can be used as a background before the presentation begins.
28
When calculating Achievement AMOs for schools and districts, use the previously stated PPG for the appropriate grade span and subject area instead of 100 then apply the reducing by half the difference between the baseline year and the Performance Proficiency Goal (PPG) methodology.
29
Calculating Achievement AMOs for Schools/Districts
Determine number of proficient students. Divide number of proficient students by number of students assessed. Convert answer from #2 to a percent. Subtract answer from #3 from the PPG. Divide the answer from #4 by 2. 6. Divide the answer from #5 by 6. 7. The answer from #6 is your annual improvement target. 8. Add the annual improvement target to the baseline to establish year one AMO. 9. Add the annual improvement target to year one AMO to establish year two AMO. 10. Continue to add annual improvement target to each AMO until six years of AMOs have been established. *This will be applicable only for subgroups with an n-count of 20 or more students. This slide can be used as a background before the presentation begins.
30
Mathematics Achievement AMO Calculation
School ABC has 250 students assessed on the mathematics assessment. 138 students were proficient (Levels 3 and 4) 138 / 250 = X 100 = 55% Percent of Proficient Students for The PPG for 3-8 mathematics is 70% = / 2 = 7.50 Growth needed over six year period 7.5 / 6 = 1.25 School ABC’s Annual Improvement Target = Year One AMO = Year Two AMO Continue to add until six years of AMOs are established This slide can be used as a background before the presentation begins.
31
Mathematics Achievement AMO Calculation (Example)
Subgroup Baseline All Students 55.00% 56.25% 57.50% 58.75% 60.00% 61.25% 62.50%
32
Achievement Annual Measurable Objective 2014-2015
A school/district can earn a “met” status for its Achievement AMO in one of two manners. Meet the established Achievement AMO. Meet the improvement measure. This slide can be used as a background before the presentation begins.
33
Achievement Annual Measurable Objective Example 2014-2015
Meet the established Achievement AMO. Subgroup Performance Proficiency Goal Baseline All Students 62.00 39.78 41.63 43.48 45.34 47.19 49.04 50.89 This slide can be used as a background before the presentation begins. For this example, this school had 41.02% of its students score proficient or higher on state administered exams in reading/language arts. This school did NOT meet the established Achievement AMO goal for reading/English language arts.
34
Achievement Annual Measurable Objective Example 2014-2015
Meet the improvement measure. Reading/English Language Arts AMO Goal 41.63% Reading/English Language Arts Improvement Measure 40.00% Reading/English Language Arts Actual Percent Proficient 41.02% For this example, this school had 41.02% of its students score proficient or higher on state administered exams in reading/English language arts. This school earned a “MET” status for Achievement in reading/language arts because it met the improvement measure. This slide can be used as a background before the presentation begins.
35
Full Academic Year (FAY)
Calculations only include full academic year students. Students are considered a FAY student if they appear on the current year 9th month attendance extract without a break in enrollment and the enrollment date is on or before the current year’s end of date fall attendance extract. FAY status for current year 10th graders taking the PLAN: Previous year 9th month attendance extract without a break in enrollment and enrollment date is on or before the previous year’s end of date fall attendance extract. Current year’s end of date fall attendance extract. Any 10th grade student, who appears on both extracts from either the administering school, the feeder school, or new school, will be considered a FAY student.
36
Accountability Exclusion Rule For Proficiency
Foreign Exchange Students (FES): All FES will be excluded FES should be flagged in Chalkable. Limited English Proficiency (LEP): For proficiency determination, the scores of LEP1 students are excluded.
37
One Percent Overage with the Alabama Alternate Assessment
The regulations do not put a limit on how many special education students may participate in alternate achievement standards. The regulations do stipulate that the number of proficient and advanced scores based on the alternate achievement standards cannot exceed 1.0 percent of all students enrolled in the grades tested at the state or school system level for accountability.
38
High School Mathematics
Exceeding the PPG If the proficiency rate is above the performance proficiency goal the expectation is to improve by 2% of the performance proficiency goal from the previous year’s proficiency rate. This increase will be expected on an annual basis for the six years. 3-8 Mathematics 3-8 ELA High School Mathematics High School ELA 1.40 1.24 1.00 1.60
39
Example of Improvement Targets for subgroups that Exceed the ppg
Performance Proficiency Goal Baseline Asian/Pacific Islander 70.00 71.41 72.81 74.21 75.61 77.01 78.41 79.81
40
When calculating Achievement AMOs for schools that contain both
3-8 grade spans and high school grade spans, targets must be met for each grade span.
41
Graduation Rate AMOs
42
Graduation Rate AMO’s In 2012-2013, Graduation Rate AMOs
were established requiring each school and district to meet or exceed its graduation rate target in order to meet its AMO goal for each subgroup. Graduation rate from was the baseline data used.
43
Graduation Rate AMO Establishment
Use the graduation rate as the baseline. Subtract graduation rate from 100. Divide the answer from step #2 by two. Divide the answer from step #3 by six. The answer from step #4 is the annual graduation rate improvement needed. Add the annual improvement needed to the baseline to establish year one graduation rate AMO. Add annual improvement needed to the year one AMO to establish year two graduation rate AMO. Continue to add annual improvement needed to each AMO until six years of AMOs have been established. *This will be applicable only for subgroups with an n-count of 20 or more students.
44
State Graduation Rate AMOs for Federal Reporting
Subgroup Baseline All Students 74.9 77.0 79.1 81.2 83.3 85.4 87.5 American Indian 84.3 85.6 86.9 88.2 89.5 90 Asian/Pacific Islander 85.2 86.4 87.6 88.8 Black 66.4 69.2 72 74.8 77.6 80.4 83.2 Hispanic 68.5 71.1 73.7 76.3 78.9 81.5 84.1 LEP 35.9 41.2 46.5 51.8 57.1 62.4 67.7 Multi-Race 87.1 88.1 89.1 Poverty 66.3 69.1 71.9 74.7 77.5 80.3 83.1 Special Education 53.7 57.6 61.5 65.4 69.3 73.2 77.1 White 80.7 82.3 83.9 85.5 88.7
45
Graduation Rate Annual Measurable Objective 2013-2014 Example
Graduation Rate Target School ABC Graduation Rate 79.1% 80% School ABC MET its Graduation Rate AMO because it met or exceeded the Graduation Rate Target.
46
Calculating Graduation Rate AMOs for Schools and Districts
Retrieve the graduation rate from the Cohort Application Portal. Subtract graduation rate from 100. Divide the answer from #2 by 2. Divide the answer from #3 by 6. The answer from #4 is your annual improvement target. Add the annual improvement target to the baseline to establish year one AMO. Add the annual improvement target to year one AMO to establish year two AMO. Continue to add annual improvement target to each AMO until six years of AMOs have been established.
47
Graduation Rate Annual Measurable Objective 2014-2015
A school/district can earn a “met” status for its Graduation Rate AMO in one of two manners. Meet the established Graduation Rate AMO. Meet the improvement measure.
48
Graduation Rate Annual Measurable Objective 2014-2015
Meet the established Graduation Rate AMO. Subgroup Baseline All Students 74.9 77.0 79.1 81.2 83.3 85.4 87.5 English Learners 35.9 41.2 46.5 51.8 57.1 62.4 67.7 For this example, this school had 80% of the “all students” group graduate within four years of becoming a first time ninth grader. This school MET the Graduation Rate AMO goal for the “all students” group. For this example, this school had 45.5% of the “English Learners” group graduate within four years of becoming a first time ninth grader. This school did NOT meet the Graduation Rate AMO goal for the “English Learners” group.
49
Graduation Rate Measurable Objective Example 2014-2015
Meet the improvement measure. Graduation Rate for English Learners AMO Goal 46.5% Graduation Rate for English Learners Improvement Measure 43.2% Graduation Rate for English Learners 45.5% For this example, this school had 45.5% of its “English Learners” students graduate within four years of becoming a first time ninth grader. This school earned a “MET” status for “English Learners” graduation rate because it met the improvement measure.
50
AMO Calculator
51
Attendance Rate
52
Attendance Rate The annual Attendance Rate goal is 90%.
The Attendance Rate will come from the 9th month attendance report for the entire school year.
53
Attendance Rate AMOs In , the Attendance Rate goal required each school/district to meet or exceed 90% for each applicable subgroup.
54
Attendance Rate Annual Measurable Objective 2013-2014 Example
Attendance Rate Goal School ABC Attendance Rate 90% 94% School ABC MET its Attendance Rate AMO because it exceeded the Attendance Rate Goal.
55
Attendance Rate AMOs Each school and district will be required to meet Attendance Rate AMO goals in one of three ways: Meet or exceed the goal of 90%. Show improvement from the previous year. Meet or exceed the goal of 90% based on data from the two most recent years’ average for the school/district.
56
Attendance Rate Annual Measurable Objective 2014-2015 Example
Meet or exceed the goal of 90%. Attendance Rate Goal School ABC Attendance Rate 90% 86% School ABC did NOT meet its Attendance Rate AMO because it did not meet or exceed the goal of 90%.
57
Attendance Rate Annual Measurable Objective 2014-2015 Example
Show improvement from the previous year. School ABC Attendance Rate 94% School ABC Attendance Rate 86% Improvement -8% School ABC did NOT meet its Attendance Rate AMO because it did not show improvement from the previous year.
58
Attendance Rate Annual Measurable Objective 2014-2015 Example
Meet or exceed the goal of 90% based on data from the two most recent years’ average for the school/district. School ABC Attendance Rate 94 94% School ABC Attendance Rate +86 86% 180 School ABC 2-Year Attendance Rate Average 180 ÷ 2 = 90% School ABC MET its Attendance Rate AMO because it met or exceeded the goal of 90% based on data from the two most recent years’ average for the school.
59
Attendance Rate AMOs Beginning 2015-2016
Each school and district will be required to meet Attendance Rate AMO goals in one of three ways: Meet or exceed the goal of 90%. Show improvement from the previous year. Meet or exceed the goal of 90% based on data from the three most recent years’ average for the school/district.
60
Alabama’s ESEA Accountability Model Indicators and Data Points
Achievement Grades 3-8 (ACT Aspire, Alabama Alternate Assessment) High School (ACT Plan— and , Alabama Alternate Assessment, ACT Aspire 10—Beginning ) Attendance Rate (9th Month Attendance Report for the entire school year) Schools Without a Grade 12 and Districts Graduation Rate (Four-Year Cohort) Schools With a Grade 12 and Districts
61
AMO Reports
62
AMO REPORT
63
Alabama’s ESEA Accountability Model Reporting Years for fall 2015 amo reports
Indicator School Year Data Achievement Attendance Rate Graduation Rate
64
Process for Measuring AMOs
School Year Baselines established and each school and district measured against the state average. School Year Use the Performance Proficiency Goal (PPG) to calculate targets for the state and each school and district. Beginning School Year Measure the state, school, and district performances against established AMO targets.
65
Improvement Measures Achievement Graduation Rate Attendance Rate
If the state, a district, or a school does not meet the established targets and/or goals, an improvement measure rule will be invoked. Achievement Graduation Rate Attendance Rate The improvement measure may be met by reducing the percentage of non-proficient students by ten percent from the previous year’s data for each subgroup that does not meet its AMO target. (Beginning ) The improvement measure may be met by improving the graduation rate by two points from the previous year’s data. (Beginning ) Show improvement from the previous year. (Beginning ) or Meet or exceed the goal of 90% based on data from the 2 most recent years’ average for the school/district. ( ) Meet or exceed the goal of 90% based on data from the 3 most recent years’ average for the school/district. ( )
66
Feeder Schools Schools Without Tested Grades (Feeder Schools)
Schools with no tested grades will be linked with the school into which the students feed since the school has no assessment data of its own. For example, schools with ninth grade only will be linked with the secondary school into which the students feed.
67
Priority Support Schools
Reward Schools Priority Support Schools Focus Support Schools
68
Reward School Modification
Beginning in Fall 2015, Reward Schools Shall Be: High Performing Schools High Progress Schools
69
Recap of Cohort 1 Priority Support School Definition
Priority Schools Priority Schools will be those schools that are the lowest performing schools in the state. The following will be used to identify Priority Schools: Currently served Tier I and II SIG schools. All schools with a Graduation Rate of less than 60% (using 2012 data). Schools with the lowest ranking achievement that have not shown progress (2010 to 2012). Schools will be selected until at least 5% of Title I schools are named.
70
Recap of Cohort 1 Focus Support Schools Definition
Focus Schools: Focus Schools are schools with large gaps between subgroups. The following will be used to identify Focus Schools: A gap index score that falls within the lowest 10% of the Title I schools Any school with a within-school achievement gap that is among the largest gap between the highest and lowest performing subgroup index scores within a subject. Schools are selected from this list until at least 10% of Title I schools in the state have been identified. The data sources are 2011 and 2012 ARMT, AAA, and graduation rate A school cannot be both Priority and Focus Priority Schools will be excluded from the focus list
71
Priority Support Exit Criteria Modifications
To exit Priority Support Status, a school must: Implement intervention services for a minimum of three consecutive years; Rank higher than the lowest 5% of Title I schools; Maintain a participation rate of 95% or more on administered assessments; and Meet or exceed the AMO goals for the “all students” subgroup for two consecutive years.
72
Priority Support Exit Criteria Modifications (Continued)
To exit Priority Support status, high schools with a graduation rate less than 60% must: Show improvement by increasing the graduation rate to 65% or above for two consecutive years; Implement intervention services for a minimum of three consecutive years; and Maintain a participation rate of 95% or more on the administered assessments.
73
Focus Support Exit Criteria
In order to exit Focus School status, the school must: Meet or exceed the AMO goals for the applicable gap subgroup(s) performance for two consecutive years. Rank higher than the lowest of 10% of the Title I schools in the state. Maintain a participation rate of 95% or more on administered assessments. Implement intervention services for a minimum of three consecutive years.
74
Eligibility to Exit Cohort 1 Priority and Focus Support
Schools will be eligible to exit cohort 1 Priority and Focus Support in the fall 2016.
75
Cohort 2 Priority and Focus Support Schools
Cohort 2 Priority Support Schools and Cohort 2 Focus Support Schools will be named January 2017.
76
Cohort 2 Priority Support Schools
In January 2017 Priority Support Schools will be the classification for: Any school that is a currently served Tier I or Tier II School Improvement Grant (SIG) school as of September 30, 2012, if applicable. Any school with a graduation rate of less than 60% for two or more consecutive years. OR Schools with the lowest ranking achievement. Schools are selected from this list until at least 5% of the Title I schools are classified as Priority.
77
Cohort 2 Focus Support Schools
Determination of Focus Schools January 2017: Use the reading and math proficiency of the two lowest performing subgroups in each school on new assessments from 2013 through 2016. Average proficiency of the two lowest performing subgroups Rank order until at least 10% of Title I schools are named. Schools that have been named priority will be removed from the list. Schools are selected from this list until at least 10% of the Title I schools in the state have been identified as Focus.
78
Annual Measurable Objective Reports
(AMO Reports) An Annual Measurable Objective (AMO) Report will be developed for each school, district, and the state. The results of the school or district AMO Report will be the trigger for recognition and support for schools and districts. The AMO report will indicate if a school, district, and the state met or not met the target or goal for each indicator.
79
Alabama’s PLAN 2020 Accountability Model
80
Alabama’s PLAN 2020 Accountability Model
Alabama currently has an A-F Law (ACT ). The ALSDE is currently working with the Accountability Taskforce on the development of the A-F grading system. A-F Law was removed from Alabama’s ESEA Waiver Renewal Request. Each school and school district will receive an A-F Report Card annually. ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
81
Proposed Indicators Measured on A-F Report Card
Learning Gains Student Achievement Alabama PLAN 2020 Program Reviews Local Indicators Graduation Rate (4-Year Cohort and 5-Year Cohort) College- and Career-Readiness Achievement Gap ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
82
Indicator Descriptors
Learning Gains Determined based on individual students who demonstrate improvement from one test administration to the next using multiple years of data for reading and mathematics. Student Achievement Determined based on the proficiency level of students in reading and mathematics. Alabama PLAN 2020 Program Reviews Determined based on a review of multiple data points used to measure district/school programs. ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
83
Indicator Descriptors
Local Indicators Each School/LEA will be required to declare one local indicator that is unique to that school/LEA with a measurable goal that is aligned to Alabama PLAN 2020. Graduation Rate Determined based on the percentage of high school students who graduate within four or five years of first entering the ninth grade. Achievement Gap Determined based on improvement of the bottom 25% of students in reading and math from one year to the next. ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
84
Indicator Descriptors
College- and Career-Readiness Indicators Determined based on the percentage of graduating seniors who meet at least one of the college- and career-ready indicators Benchmark on Any ACT Subtest (Math—22, English—18, Reading—22, Science—23) Qualifying Score on AP or IB Exam Military Enlistment Approved Transcript College or Postsecondary Credit While in High School Silver Level or Higher on the ACT WorkKeys Approved Industry Credentials ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
85
Alabama’s PLAN 2020 Accountability Model Indicators (A-F Report Cards)
Two Phases Phase I December 2016 Phase II December 2017 ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
86
P2A—Data Reporting Mechanism
Beginning fall 2015, a web-based data system will be available for districts and schools. ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
87
A-F Report Card Indicators
K-8 Schools
88
Proposed Phase I Indicators of A-F Report Cards (K-8)
December 2016 Phase I A-F Report Cards Learning Gains Student Achievement Local Indicators ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
89
Proposed Phase II Indicators of A-F Report Cards (K-8)
December 2017 Phase II A-F Report Cards (Total Points 600) Learning Gains (180 Points) Student Achievement (60 Points) Local Indicators (150 Points) Achievement Gap (60 Points) Alabama PLAN 2020 Program Reviews (150 Points) ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
90
A-F Report Card Indicators
9-12 Schools and K-12 Schools
91
Proposed Phase I Indicators of A-F Report Cards (9-12 and K-12)
December 2016 Phase I A-F Report Cards Graduation Rate Student Achievement Local Indicators ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
92
Proposed Phase II Indicators of A-F Report Cards (9-12 and K-12)
December 2017 Phase II A-F Report Cards (Total Points 600) Graduation Rate (60 Points) Student Achievement (60 Points) Local Indicators (150 Points) Learning Gains (60 Points) College- & Career-Ready (120 Points) Alabama PLAN 2020 Program Reviews (150 Points) ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
93
A-F Report Card Indicators
Districts
94
Proposed Phase I Indicators of A-F Report Cards (District)
December 2016 Phase I A-F Report Cards Local Indicators Student Achievement Graduation Rate Learning Gains (Grades 4-8) ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
95
Proposed Phase II Indicators of A-F Report Cards (District)
December 2017 Phase II A-F Report Cards (Total Points 600) Local Indicators (150 Points) Graduation Rate (60 Points) Student Achievement (30 Points) Learning Gains (60 Points) Achievement Gap (30 Points) College- & Career-Ready (120 Points) Alabama PLAN 2020 Program Reviews (150 Points) ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
96
ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
A-F Report Card ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
97
Actions to Help Schools Master Accountability Indicators
Schools should complete and follow individualized Student Four Year Plans. (Achievement, Graduation Rate, Learning Gains) Teach the Alabama College- and Career-Ready Standards (Achievement, Achievement Gap, Graduation Rate, College- and Career-Ready) Schools should also utilize the Early Warning System to assist students who are at risk or in danger of becoming at-risk students. (Graduation Rate, Attendance, Achievement, Learning Gains) Helping Schools Master Accountability Indicators ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
98
Alabama’s Accountability Act
99
Alabama’s Accountability Act
Purpose Innovative schools and school systems may be established in Alabama in accordance with this chapter. (b) The purpose of this chapter is to advance the benefits of local school and school system autonomy in innovation and creativity by allowing flexibility from state laws, regulations, and policies. (Act 2013‐64, p. 112, §2.) A Failing School is a public K-12 school that is either of the following: Is designated as a failing school by the State Superintendent of Education. Does not exclusively serve a special population of students and is listed in the lowest six percent of public K- 12 schools based on the state standardized assessment in reading and math. *Note: A list of failing schools is produced annually in accordance with the law.
100
* Alabama State Department of Education *
Questions Contact the ALSDE Accountability Office Angela Martin Julie Turner Paul Bonner Accountability * Alabama State Department of Education * ACCOUNTABILITY MODEL INFORMATION SUBJECT TO CHANGE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.