Download presentation
Presentation is loading. Please wait.
Published byเดือนเพ็ญ เคนเนะดิ Modified over 5 years ago
1
Maximo Scheduler and Maximo Scheduler Plus Overview
2
DISCLAIMER IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion. Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion. © Copyright IBM Corporation All rights reserved.
3
Maximo Asset Management
Scheduler – work management tool embedded in Maximo DOC Server iLog DOC Optional: clients may choose not to use the optimization capability and can skip the DOC installation during the install process Required only for Optimization Scheduler 7.6.5 Add-on product to Maximo EAM, code embedded in core Maximo therefore a single install Requires a separate license purchase Includes integration adapter and optimization engine and models Maximo Scheduler Maximo Asset Management Maximo fix pack level
4
Roles We Cater To With Maximo Scheduler
Receives assignments, optimized routes and directions Reports on progress and work completion Technician Planner Scheduler Repair Facility Manager Floor Supervisor/ Dispatcher Assign scheduled work Monitor and assign emergencies Build daily crews View and adjust crew work in the field Model work steps in Job Plans and Routes Define PM frequencies Forecast long term work and cost Use historical data to adjust the plan Assign WOs of a mobile asset to a facility Assign work within the repair facility Create rolling work schedule Resource level Schedule windows CPM Monitor schedule compliance
5
Role Based Applications in Maximo Scheduler
Roles Graphical Scheduling Planners and Schedulers Graphical Assignment Supervisors and Dispatchers Graphical Assignment - Repair Facility Repair Facility Managers Graphical Crew Management Supervisors Everyplace Mobile Templates Supervisors and Field Technicians
6
Scheduler Plus Offers the following in addition to Maximo Scheduler
Managing large projects Model complex work order network dependencies Highlight critical path, % complete Appointment booking Make customer appointments within a schedule window Customer notifications – cancel / reschedule Dynamic dispatching Auto refresh, re-optimization based on real-time progress Incorporate real-time traffic conditions Weather integration Incorporate weather data into planning/scheduling and dispatching Weather alerts / notifications
7
(includes Maximo Scheduler)
Scheduler Plus – embedded in Maximo End-to-end work management solution built on Maximo Scheduler Code embedded in core Maximo therefore a single install Available On-prem and via SaaS Requires a separate license purchase (license includes Maximo Scheduler functionality) Includes the optimization models iLog DOC Required only for Optimization 7.6.6 Maximo Scheduler Plus 7.6.6 (includes Maximo Scheduler) Maximo Asset Management
8
Role Based Applications
Scheduler Plus further enhances the Scheduler applications as well as offers two new applications Application Roles Graphical Scheduling^ Planners and Schedulers Graphical Assignment^ Supervisors and Dispatchers Graphical Assignment - Repair Facility Repair Facility Managers Graphical Crew Management Supervisors Everyplace Mobile Templates Supervisors and Field Technicians Graphical Appointment Book Customer Service Representatives Graphical Scheduling – Large Projects* ^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus only
9
Pedigree 9 7.6 highlights 2009 2010 2012 2013 2015 2016 2017 May
Scheduler 7.6.5 Planning buckets Optimization performance and enhancements Scheduler Plus 7.6.6 Weather Alerts Notifications for Alerts and Appointments Project Scheduling – GS-Large Project, CPM backward pass and filter, % complete Dynamic Dispatching Scheduler 7.6.3 Complete Java Applet replacement with new technology RFEs/Usability Scheduler 7.6.4 Excel Export WO Synonym colors PM Start Time Scheduler Plus 7.6.4 Weather Forecast Appointment Booking Project Scheduling – dependencies between anything Scheduler 7.6.1 New technology Repair Facility Mgmt PM Costing Usability Scheduler 7.6.2 Graphical Scheduling Asset/Location types Mult-tenancy support Gantt usability Scheduler 7.5.2 Optimization Scenario Management Compliance Dashboards Graphical Crew Mgmt Scheduler 7.5.1 Graphical Assignment Dispatching Schedule Compliance Crews Everyplace templates Other Resource Availability Maximo Scheduler 7.1.1 PM Forecasts Maximo Scheduler 7.1 Work and Resources in Gantt View Labor Load & Availability Critical Path Method May 9
10
Roadmap Release 7.6.x Release 7.6.x 4Q 2017 2018 Scheduler Plus
Weather Alert notifications (SMS) Project Scheduling (Phase 3) Schedule dashboard Appointment Booking (Phase 3) SMS notifications Project Scheduling (Phase 4) Management reports Estimate Time to Completion Dynamic Dispatching (Phase 2) Real-time traffic Optimization Performance, Large project optimization (buckets), Traffic Weather Add map to Weather Alerts Admin Appointment Booking (Phase 4) Resource dependent windows Usability Graphical Assignment – work filtering to the Assignment view, Highlighting related assignments, Show dependencies between selected assignments, Show all dependencies in assignment view Variable Alternate Availability Configurable mouse-over and tool tips Optimization GS – Modified Availability GS – Alternate Availability GA – Multiple Work Zones Performance Performance Enhancements Project flag to not load related or non-persistent fields Improved SQL Select one or more rows for refresh Code profiling (clean up from Applet version) Graphical Resource View Availability heat map w/ shift totals and bulk edit UX Enhancements Gantt chart record grouping WO/task creation from the Gantt Inline editing Saved and conditional layout Schedule Data Integrity Tool Compliance Add details to tabs/graphs Optimization GS: Spatial Publish to 3rd party calendars Release 7.6.x 4Q 2017 Release 7.6.x 2018 The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
11
The DRAX Rainbow Chart ^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus only
12
Content for Release 7.6.x Weather Alert notifications (SMS)
Scheduler Plus Scheduler Weather Alert notifications (SMS) Project Scheduling (Phase 3) Schedule dashboard Appointment Booking (Phase 3) SMS notifications Usability Graphical Assignment – work filtering to the Assignment view, Highlighting related assignments, Show dependencies between selected assignments, Show all dependencies in assignment view Variable Alternate Availability Configurable mouse-over and tool tips Optimization GS – Modified Availability GS – Alternate Availability GA – Multiple Work Zones Performance Performance Enhancements Project flag to not load related or non-persistent fields Improved SQL Select one or more rows for refresh Code profiling (clean up from Applet version) The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
13
Scheduler Plus SMS Text Messages
Option for text communication in addition to Appointment Confirmations Initial confirmation of appointment Reschedule Assignment of technician with time Weather Alerts Type of Alert and its time frame Work Orders associated to you that are effected 13
14
Scheduler Plus – Schedule Dashboard
How are my projects doing? Totals of all the Schedules the user has access to view Cron to run calculations in off Quick Filter and Column Filtering Print Download to Excel User selected columns to display
15
Scheduler – Graphical Assignment usability
Select only work records by holding Ctrl key when boxing with the mouse or select only Assignments using Alt key, right click and assign all to one labor Enable/Disable Filtering from the Work View On Select display other work dependencies - color all tasks in same WO - draw lines to show constraints
16
Scheduler – Graphical Assignment usability - continued
Work View moved before Assignment View Select value list provided for column filtering Ability to Filter to Selected work or assignment records Toggle Tiled Mode returned from 7.5 version
17
Scheduler – Variable Alternate Availability
Don’t have labor, crews and tools in Maximo? Use Alternate Availability to schedule work Note we now allow decimal values for partial days Adding an extra Mechanic for 2 days? Duplicate any default craft/shift and provide the dates you will have a different number of labor.
18
Scheduler – Configurable Tool Tips
Would you like to adjust the values shown in one of the 12 tool tips within the Scheduler applications? Your Administrator can adjust the values, preview before saving, even reset to the default values.
19
Scheduler – Show to Level
System property sets the number of levels you want to see It is your best estimate of how many levels users will typically have, and want to expand to Select a level and immediately expand to it
20
Scheduler – New Optimization constraints
Graphical Scheduling Resource Leveling and Capacity Planning applies various resource availability Modified Availability of Labor for vacations and extra time Alternate Availability Performance Improvements Resolution Mins removed – now automatically calculated Limit to the number of solutions we resolve to Graphical Assignment Labor Assignments and Spatial Assignments now applies various resource availability Allow secondary work zone assignments Allow Secondary Craft Assignments Limit to the number of solutions we resolve to Spatial Assignments only Work Zones now optional
21
Scheduler – Performance Enhancements
Graphical Scheduling - User controlled performance options Ability to not bring in related work order records Refreshing single records Ability to minimize the resource section Various improvements to SQL and indexes
22
Scheduler – Performance Enhancements
Graphical Assignment User actions that now refresh only a single row instead of refreshing the full graphical view Right click actions on the resources Modified Availability Assign To Assign Available Labor Right click actions on the assignment bar Split Work According to Shifts Split Work Split Work into Three Records Merge Split Assignments Available labor Create Assignment Add/View Notes Various improvements to SQL and indexes
23
Scheduler – Q&A We are just getting started using Scheduler and have had a request from our users to be able to show the day of the week on the Gantt chart. Is there a way to do this? My question is on Graphical Assignment Why did they remove the split screen Gantt View and replace it with the Assignment View and Work View Tabs. The user now has to jump between tabs to see the trades whiles before they could see everything on the one tab.
24
Resources Wiki: Or simply google search for “Maximo Scheduler” to find the wiki
25
Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.