Presentation is loading. Please wait.

Presentation is loading. Please wait.

WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003

Similar presentations


Presentation on theme: "WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003"— Presentation transcript:

1 WNG SC Opening Report IEEE 802.11, DFW, Texas Mar 9-14, 2003
doc.: IEEE /423r1 July 2001 March 2003 WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003 TK Tan, Philips (Chair) Bruce Kraemer, Intersil (Vice-chair) TK Tan, Bruce Kraemer Al Petrick, Direct2Data Technologies

2 Agenda Objectives Agenda Minutes Presentations March 2003
TK Tan, Bruce Kraemer

3 WNG SC Objectives – Dallas, TX
March 2003 WNG SC Objectives – Dallas, TX Review updates from ETSI BRAN #32, MMAC and IAG meetings Joint Regulatory Update Presentation from 3GPP SA2 Further discussions on VOIP Wireless Interworking activities Wireless Interworking issues – security, roaming, QoS etc.. Liaison activities WLAN Spectrum allocation for Korea TK Tan, Bruce Kraemer

4 doc.: IEEE /423r1 July 2001 March 2003 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 TK Tan, Bruce Kraemer Al Petrick, Direct2Data Technologies

5 Inappropriate Topics for IEEE WG Meetings
March 2003 Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 TK Tan, Bruce Kraemer

6 Agenda Overview Monday Mar 10 7:00 – 9:30 pm Announcements
March 2003 Agenda Overview Monday Mar 10 7:00 – 9:30 pm Announcements Radio Regulatory update Carl Stevenson Minutes approval r0 WNG Updates from ETSI-BRAN, MMAC Discussion on WIG Activities - Liaison response from 3GPP2 xxxxr0-WNG-3GPP2 Presentation1 – 3GPP SA2 - Ritter Presentation2 – WLAN-Cellular Interworking - Pazhyannur Wed Jan :00 – 10:00 am Announcement Discussion - WLAN Spectrum allocation Korea - Kramer Presentations – McCann, Hollister TK Tan, Bruce Kraemer

7 March 2003 TK Tan, Bruce Kraemer

8 Relevant Documents 11-03-191r0-WNG-WNG_Opening_Report.ppt
March 2003 Relevant Documents r0-WNG-WNG_Opening_Report.ppt r0-WNG-3GPP-LiaisonResponse_S doc r0-WNG-WLAN-Cellular-Interworking.ppt r0-WNG-3GPP_Implicit_Reqts_WLAN_BlackBox_S doc r0-WNG-3GPP_s draft TS v1.6.0.doc TK Tan, Bruce Kraemer


Download ppt "WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003"

Similar presentations


Ads by Google