Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter 2 Knowledge need to know before start a project

Similar presentations


Presentation on theme: "Chapter 2 Knowledge need to know before start a project"— Presentation transcript:

1 Chapter 2 Knowledge need to know before start a project
Method of generating the concept Method of decision making Review the worth of a project Communication methods

2 Methods of generating concepts
Brainstorming as a source of ideas Using method as a source of ideas The use of analogies in design Finding ideas in reference books and trade journal using expert to help generate concept

3 The individual designer: A model of human information procession

4 Type of knowledge Type of memory General knowledge
Domain-specific knowledge Procedure knowledge Type of memory Short term memory Long term memory

5

6

7 Analogy Umbrella VS. removal of urinary calculi

8 Nature system Velcro Fastener

9 Methods of decision making
Decision matrix Step 1: choose the criteria for comparison. Step 2: Develop Relative importance weightings Step 3: Select Relative Importance Weightings Step 4: Evaluate Alternatives . Step 5 Compute Satisfaction

10 Decision matrix Criteria (requirement s or specification importance
Alternative 1 Alternative 2 Alternative 3 Criterion 1 xx Evaluation of alternate 1 using criteria 1 Evaluation of alternate 2 using criteria 1 ……. Criterion 2 yy Evaluation of alternate 1 using criteria 2 Evaluation of alternate 2 using criteria 2 …….. ……… Satisfaction Score for Alternative 1

11 Example: Using the decision matrix:

12 Evaluation Based on advanced Decision matrix
Step 1: choose the criteria for comparison. Step 2: Develop Relative importance weightings Step 3: Select Relative Importance Weightings Step 4: Evaluate Alternatives . Step 5 Compute Satisfaction Satisfaction =Σ(belief*importance weighting)

13 Believe Belief=confidence placed on an alternative’s ability to meet a target set by a criterion, requirement, or specification, base on current knowledge.

14 Belief=p(k)*p(c)+(1-p(k))*(1-p(c))

15 Example Criteria Importance Alternative Linear guide Voice coil 1
Can support the optical system 50 0.77 0.3 2 Move fast 20 0.5 0.9 3 Can correct the light abbreviation 0.8 4 Can Do small adjustment 10 0.6 Satisfaction 62 55

16 Making a portfolio decision
SA: strongly agree A; Agree N: neutral D: disagree SD: Strongly disagree VC: Very certain C: Certain N: Neutral U: uncertain VU: very uncertain

17 Review the worth of a project Before beginning a project
Is there a good potential return on investment? Does the new product or improvement fit the company image? Does it fit the distribution channels? Is there sufficient production capacity in-house or with known vendors? What will the project cost?

18 Communication methods
Design Record-design note book Documents communicating with management-design reviews Documents communicating the final design -drawing of components and assemblies -written documentation to guide manufacturing, assembly, inspection, installation, maintenance, retirement and quality control


Download ppt "Chapter 2 Knowledge need to know before start a project"

Similar presentations


Ads by Google