Download presentation
Presentation is loading. Please wait.
Published byClaude Latour Modified over 6 years ago
1
grounding / EMC session @ B2GM20
grounding / EMC B2GM20 M. Andrew
2
TOP grounding/shielding scheme @ 2015
2F tightly connected TOP Al frame HV PMT case at -HV Sens LV power supply returns tied together here, and also to TOP Al frame FE To E-hut LV To E-hut To E-hut 1F BE CAL CsI support To E-hut E-hut Belle-II structure grounding / EMC B2GM20 M. Andrew
3
grounding / EMC session @ B2GM20
grounding / EMC B2GM20 M. Andrew
4
grounding / EMC session @ B2GM20
grounding / EMC B2GM20 M. Andrew
5
grounding / EMC session @ B2GM20
grounding / EMC B2GM20 M. Andrew
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.