Download presentation
Presentation is loading. Please wait.
Published byJutta Kaiser Modified over 5 years ago
1
IEEE 802.11 Regulatory SC Nanjing Meeting Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 September 2013 IEEE Regulatory SC Nanjing Meeting Plan and Agenda Date: Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion
2
April 2009 doc.: IEEE /xxxxr0 September 2013 Abstract This presentation is the plan for the IEEE Regulatory Standing Committee meeting at the Nanjing IEEE 802 Wireless Interim the week of September 16, 2013. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion
3
Agenda [TAM2+PM1] Assign a recording secretary Administrative items
September 2013 Agenda [TAM2+PM1] Assign a recording secretary Administrative items Required notices Introduction The regulatory summaries Action items and issues NPRM FCC update NPRM FCC response Ofcom consultations ITS/DSRC Coexistence Any other business Adjourn Rich Kennedy, BlackBerry
4
Administrative Items Required notices Chair and Secretary
September 2013 Administrative Items Required notices Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Working Group Policies and Procedures - Chair and Secretary Chair is Rich Kennedy (BlackBerry) Peter will act as Recording Secretary Rich Kennedy, BlackBerry
5
SC Operating Rules Anybody can vote, present, and make motions
May 2012 doc.: IEEE /0675r0 September 2013 SC Operating Rules Anybody can vote, present, and make motions Participation in SC during WG Plenary or Interim counts towards voting rights All motions must pass by a 75% majority Rich Kennedy, BlackBerry Clint Chaplin, Chair (Samsung)
6
Other Guidelines for IEEE WG Meetings
September 2013 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Rich Kennedy, BlackBerry
7
Introduction Outputs from this group must go through 802.18 Purpose
September 2013 Introduction Purpose Improve the working relationship between the technical experts and the regulatory specialists, especially when it comes to critical technical issues Scope The group will review new regulatory changes or impending changes affecting standards Each meeting will focus on the most critical issue at the time Critical Issue Focus Direct impact on IEEE current and future standards Response/Input deadlines Coordination with IEEE (RR-TAG) Coordination with the Wi-Fi Alliance Outputs from this group must go through Rich Kennedy, BlackBerry
8
Regulatory Summary – North America
September 2013 Regulatory Summary – North America US NPRM FCC 13-22 FNPRM/NOI FCC in Reply Comment period Canada IC developing TVWS standards Mexico Rich Kennedy, BlackBerry
9
Progress on Unlicensed Spectrum Changes
September 2013 Progress on Unlicensed Spectrum Changes NPRM FCC (59 pages) Opening 5350 to 5470 MHz and 5850 to 5925 MHz and resolving the TDWR interference mitigation issue Comment period closes May 28th Reply Comment period closes July 24th R&O/FNPRM/NOI FCC (202 pages) Reassessment of Federal Communications Commission Radiofrequency Exposure Limits and Policies Proposed Changes in the Commission's Rules Regarding Human Exposure to Radiofrequency Electromagnetic Fields Comment period closes September 3rd Reply Comment period closes November 1st Rich Kennedy, BlackBerry
10
Industry Canada TVWS Specifications
September 2013 Industry Canada TVWS Specifications RSS-222 Spectrum Management and Telecommunications Radio Standards Specification White Space Devices (WSDs) DBS-01 Spectrum Management and Telecommunications Database Requirements White Space (WS) Database Specifications Rich Kennedy, BlackBerry
11
Regulatory Summary – European Union
September 2013 Regulatory Summary – European Union European Commission EC voted on making an additional 1200 MHz of spectrum for mobile broadband [results not known] ETSI BRAN EN White Space Devices (WSD); Wireless Access Systems operating in the 470 MHz to 790 MHz frequency band; Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive Now at v1.0.0 – out for approval EN and EN in revision Ofcom Beginning TVWS trials ( Two consultations Rich Kennedy, BlackBerry
12
Regulatory Summary - Asia
September 2013 Regulatory Summary - Asia Rich Kennedy, BlackBerry
13
NPRM FCC 13-22 Comments (Proceeding FCC 13-49)
September 2013 NPRM FCC Comments (Proceeding FCC 13-49) Comment period closed May 28th NPRM in (key phrases highlighted) Comments outline in Draft Comments in Final Comments in Rich Kennedy, BlackBerry
14
NPRM FCC 13-22 Reply Comments
September 2013 NPRM FCC Reply Comments FCC received Comments survey in Reply Comments framework in Reply Comments draft in Rich Kennedy, BlackBerry
15
FCC 13-22 Reply Comments Plan
September 2013 FCC Reply Comments Plan Complete the work on the FCC Reply Comments Vote to approve and send to the RR-TAG Rich Kennedy, BlackBerry
16
September 2013 Motion #2 Motion: To approve document reg-fcc reply-comments as the IEEE input to with the intention of approval by the RR-Tag and ExCom and submittal to the FCC on or before July 24, 2013. Moved by: Vinko Seconded by: Eldad Discussion? Results: 12 Y 0 N 0 A The motion passes Rich Kennedy, BlackBerry
17
September 2013 Any Other Business Second Report & Order / Further Notice of Proposed Rule Making / Notice of Inquiry FCC 13-39 ETSI EN v1.8.1 and EN v1.7.1 Rich Kennedy, BlackBerry
18
Teleconferences Weekly on Thursdays, 12:30 to 14:00 ET September 2013
Rich Kennedy, BlackBerry
19
References September 2013 NPRM FCC 13-22 R&O/FNPRM/NOI FCC 13-39
Industry outline for NPRM FCC response NPRM FCC Dissected FCC Comment Framework FCC Comments FCC Comments survey FCC Reply Comments framework FCC draft Reply Comments Rich Kennedy, BlackBerry
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.