Download presentation
Presentation is loading. Please wait.
1
Potential Minor Release Drop 4 Timeline & Scope
Potential Scope Items: XRN Acceptance of Contact Details Updates (currently awaiting ChMC solution approval) XRN Removal of validation for AQ Correction Reason 4 (currently progressing through Capture) Mod 655 – Introduction of suitable classification of Ratchetable Supply Points & Ensuring Accurate Capacity Allocations (SOQ) . (currently going through requirements gathering) Potential Xoserve internal Business Improvement changes (TBC) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov 2019 J u n e 1 9 – C h M A g r S c o p UT Dec Potential Minor Release Drop 4 Design Build ST & Assurance CM PT / RT IMP PIS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.