Industrial( Bundang Power Plant) TDS : 170ppm
Client name: Korea KOSEP Bundang power plant position: No. 186, Bundang-do, Bundang District, Seongnam, Gyeonggy-do Equipment name: conduit scale and anti-corrosion cleaning device Specification: HIME 24 Conduit size: 450mm Fluid and flow: Hangang river water 660 Ton/hr TDS : 170ppm Objective: after long time using, the water conduit of the water processing system of Bundang power plant has been corroded and producing SCALE from the inside. This project is to implement anti-corrosion treatment and regular inspection to ensure the soundness and reliability of the water conduit. Inspection method Point 4 locations in the water conduit that has mounted anti-corrosion devices, and check the soundness in the term of one year (four months before and after mounting as a circle, 4 times in total) ① jariir Transr Pump Dishar Har inspection hole ② jariir Int Har inspection hole ③ jariir Disar Har inspection hole ④ jariir Har sin sample-taking location
2
Industrial ( (Bundang Power Plant) System map Stirring Raw water tank
Hangang water Purity Take sample
3
Industrial( Bundang Power Plant)
① Clarifier Transfer Pump Discharge Header inspection hole ② Clarifier Inlet Header inspection hole Before mounting ( ) After mounting ( ) Before mounting ( ) After mounting ( ) ③ Clarifier Discharge Header inspection hole ④ Take sample from Clarifier Header Line Before mounting ( ) After mounting ( ) Before mounting ( ) After mounting ( )
4
Industrial ( Bundang Power Plant) ① inspection hole Clarifier Transfer
Pump Discharge Header inspection hole Before mounting ( ) After mounting ( )
5
Industrial ( Bundang Power Plant) ② inspection hole Clarifier Inlet
Header inspection hole Before mounting ( ) After mounting ( )
6
Industrial( Bundang Power Plant) ③ inspection hole Clarifier Discharge
Header inspection hole Before mounting ( ) After mounting ( )
7
Industrial ( Bundang Power Plant) ④ Take sample from Clarifier Header
Line Sample cut for second time Before mounting ( ) After mounting ( )
8
Industrial( Bundang Power Plant) ※Inspection result
The inspection result of the inspection hole of Clarifier Transfer Pump Discharge Header is the same with the pictures above. Compared with Dec, 2008, the raised SCALE has almost disappeared, and the SCALE of Clarifier Inlet and Discharge Inlet is partial less. - Like the first time, take a 200*100mm sample from Clarifier Header Inlet Line, cut and dry it, and then check the corrosion result of SCALE (check ½ of the sample). First time, 24.18g, second time for 15.83g, 35% reduced. Before mounting ( ) After mounting ( )
9
Industrial al ( Bundang Power Plant)
After Scalewatcher is mounted, the turbidity of the fluid and the concentration of the suspension solid in the conduit increased by 9 times. Through the separation of ferric oxide, ferrum content is increased.