Réunion service Instrumentation Activités CMS-Traces
Nick Lumb Institut de Physique Nucléaire de Lyon 22/02/2018
2
Laser scan results +3.5mm -3.5mm +3.5mm -3.5mm -0.4mm +0.4mm +0.4mm
3
1 Final machining Brand new large area 5 axis CNC machine
2S inserts: machined to correct level in Z, nipple, fixation holes PS inserts: machining to correct level in Z (flush with CF skin), fixation holes
4
Measurement of insert positions
Romer measurement arm with φ3mm ruby tip Prototype constrained by vacuum on pre-machined platform Points compared directly with imported CAD model of ideal object
5
XY positions (screw holes)
Mean -0.004 RMS 0.013 Mean 0.014 RMS 0.012 Mean 0.000 RMS 0.005 Mean 0.003 RMS 0.010 Well within spec. of +/-50 microns
6
2S inserts Z positions: Z+ side (module mounting surfaces)
Mean 3.851 RMS 0.014 Outliers correspond to 9 inserts situated above the ‘step’ Binned values correspond to height above arbitrary reference plane defined from calibration measurements of support platform Module mounting surfaces aligned with RMS of 14 microns!
7
2S inserts Z positions: Z- side (module mounting surfaces)
Mean RMS 0.015 ~Same RMS for Z- side Distance between mounting surfaces on the two sides of the prototype should be difference between the means of the distributions: – ( ) = 16.66 Target was /- 0.05mm There are two complicating factors: Mistake during CNC programming: assumed 10mm sandwich thickness instead of 9.6! When prototype is turned to measure the second side, link with measurements of first side is lost, introducing a possible offset
8
Next: thermal measurements!