Download presentation
Presentation is loading. Please wait.
1
Pier Giorgio Marchetti - European Space Agency
HMA Architecture Working Group GFZ premises room H207 h Draft Agenda Pier Giorgio Marchetti - European Space Agency Slide 1
2
Draft Agenda GMES DA (JM)
EO-DAIL implementation status report and support which the HMA AWG may have to provide (JM) RIDs raised by the EO-DAIL project, (JM) EUSC project presentation (LC) ERGO project Implementation of ebRIM (SG) HMA-T project call (YC) Forthcoming GIGAS support action financed by DG INFSO addressing state of play and convergence within GMES, INSPIRE and GEOSS (PGM) CEN BT/WG 202 "Space" work status report (PGM) Call For Participation in OGC and GEOSS Interoperability Programs 2008 (PGM) Update of the catalogue document (JM, YC) Slide 2
3
Election of the HMA AWG secretary
Draft Agenda Election of the HMA AWG secretary GMES implementation: procedures for standards update Criteria and selection of ex-officio value adder membership Workplan 2008, priority issues HMA follow on activities and ITT Meeting plan 2008 Slide 3
4
Election of the HMA AWG secretary
Draft Agenda Election of the HMA AWG secretary Slide 4
5
GMES implementation: procedures for standards update
Draft Agenda GMES implementation: procedures for standards update Organise periodic teleconference (initially monthly) to update on corrections/ evolution (documented in the form of RIDs) Slide 5
6
Criteria and selection of ex-officio value adder membership
Draft Agenda Criteria and selection of ex-officio value adder membership Slide 6
7
Workplan 2008, priority issues
Draft Agenda Workplan 2008, priority issues See HMA follow on Slide 7
8
HMA follow on activities and ITT
Task 1 - Project Management Task 2 – Product Metadata Extension radar altimeter and limb looking/ occultation products. Task 3 - Feasibility Analysis Service (Sensor Planning Service) The completion of the work initiated in the HMA contract, on feasibility analysis service at the moment specified as OpenGIS® Sensor Planning Service Application Profile for EO Sensors OGC to: specify unambiguously the interactions, taking into account the issues already identified in current version of the document: The preliminary list of input parameters may be described by using a dictionary. In this case, the parameters may be referenced with a URI. The complexity of the input parameters of GetFeasibility and Submit operations using sweCommon The lack of recursivity in sweCommon for certain types. The alignment of the specification with the evolving OGC “common”, Completely specify all the operations: GetCapabilities, DescribeTasking GetFeasibility Submit DescribeResultAccess The design, development and testing of a Sensor Feasibility Server to be used by the Agency as a reference server for the testing and demonstration of the relevant specification within the SSE environment. Slide 8
9
HMA follow on activities and ITT
Task 4 - Review of the identity management standards Task 5 - Online Data Access Task 6 – Harmonisation and Update of Architecture and ICD Documents Slide 9
10
Meeting plan 2008 Draft Agenda
Teleconference after EO-DAIL CDR mid October 2008 OGC TC 3 December 2008 Slide 10
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.