Presentation is loading. Please wait.

Presentation is loading. Please wait.

Faster Cost Estimate Convergence with SLOC-Check

Similar presentations


Presentation on theme: "Faster Cost Estimate Convergence with SLOC-Check"— Presentation transcript:

1 Faster Cost Estimate Convergence with SLOC-Check

2 Cone of Uncertainty In Cost Estimation
Ainsley Chong

3 Why are Cost Estimates not Revisited?
Cost estimation is complicated Cost estimation is time consuming The project manager does not know what is happening at the coding level Ainsley Chong

4 What are Cost Estimates Used For?
Unfortunately: Project Proposal Tool Ideally: Project Management Tool Ainsley Chong

5 SLOC-Check Concept: Goals:
An online tool that allows project managers and developers to quickly exchange information about the estimated size of the code (SLOC) Goals: Create “early warnings” when a estimate is no longer accurate Provide project managers developers better information about the state of the project Provide transparency to developers about project manager expectations Lightweight: should be easy to implement, and only take about 5 minutes of extra time per developer, per week Ainsley Chong

6 SLOC-Check: Setup Ainsley Chong

7 SLOC-Check: PM Reporting
Ainsley Chong

8 SLOC-Check: Developer Reporting
Ainsley Chong

9 SLOC-Check: Summary Report
Ainsley Chong

10 Summary SLOC-Check will provide a quick way for project managers and developers to exchange information about the current state of the project Better information will lead to better estimates, and thus earlier detection of problems in the project Ainsley Chong

11 References Pongtip Aroonvatanaporn, Chatchai Sinthop, Barry Boehm, Reducing Estimation Uncertainty with Continuous Assessment: Tracking the “Cone of Uncertainty”, USC CSSE 2010 Ainsley Chong


Download ppt "Faster Cost Estimate Convergence with SLOC-Check"

Similar presentations


Ads by Google